2014-01-17Aanbesteding Concessie Windturbines Hazeldonk (Gemeente Breda)
De gemeente Breda heeft ambitieuze duurzaamheiddoelstellingen: in 2044 energieneutraal, in 2020 30 % CO2-reductie ten opzichte van 1990, in 2020 20 % duurzame energie in de energievoorziening en minimaal 2 % efficiencyverbetering per jaar. Om deze doelstellingen te halen is de realisatie van windenergieprojecten onontbeerlijk. Op het bedrijventerrein Hazeldonk (onderdeel van het grensoverschrijdende Logistics Center Hazeldonk-Meer) is een planologische procedure doorlopen om het bestemmingsplan zodanig …
Bekijk de aanbesteding » Genoemde leveranciers:Samenwerkingsverband DunoAir BV en...
2013-11-28Wind Turbine Generator Package (Vattenfall Vindkraft A/S)
Vattenfall intents to participate in the call for bids for the concession of offshore wind farm Horns Rev 3 concession, led by the DEA [Danish Energy Agency]. This wind farm will have a capacity of maximum 400 MW and will consist of foundations, wind turbine generators and inter array cables.
The total scope of works of this tender includes the design, engineering, manufacturing, fabrication, supply, installation, commissioning and operation and maintenance of the offshore wind turbine generators for the …
Bekijk de aanbesteding »
2013-09-30Raamcontract UCP (N.V. Nederlandse Gasunie)
The scope for this European tender is the retrofit of UCP's for gasturbine driven gas compression units. The UCP's are situated in the Netherlands on gas compression plants owned by Gasunie. The retrofit covers replacement of the complete UCP and optionally the field instrumentation. The retrofit includes engineering, assembling, FAT, delivery onsite, installation, commissioning, start-up and SAT. Documentation and drawings are part of the scope.
On request of Gasunie the supplier should be able to give …
Bekijk de aanbesteding »
2013-03-01Replacement Generator Velsen 24 (Generator Replacement Velsen 24)
The blast furnace gas fired power plant in Velsen (VN24) is located in the north of the Netherlands along the
“Noordzee kanaal”. The unit with a capacity of approximately 459 MW has been commissioned in 1974 and
has been in operation until December 2012 for more than 200.000 hours. The lifetime of the entire unit will be
extended till 2026. It has been decided that the current 550 MVA, 21kV, cos φ 0.8, 50Hz, H2 directly cooled
generator will be replaced.
It has been decided to start tendering for an …
Bekijk de aanbesteding »
2012-03-05Provision of scheduled and unscheduled maintenance of wind turbine generator (WTG) (N.V. Nuon Duurzame Energie)
There are 7 windparks with different number of turbines of different types / manufacturers. All these windparks are out of warranty. We are looking for contractors who can provide us with maintenance work. The contractor shall provide to the contracting entity during the term all work, supplies and services that are required to keep the turbines required to keep the turbines operational and in good condition. The contract will include scheduled maintenance as described in the service and maintenance …
Bekijk de aanbesteding »
2012-01-18Design, Build (Supply, Fabrication and Installation), Operate and/or Maintain of one, two or three innovative wind... (Q10 Offshore Wind BV)
Contracting Entity has obtained a concession for the construction of an offshore wind farm in the Dutch Exclusive Economic Zone in the Q10 sector. The Q10 project has obtained a subsidy from the Dutch authorities under the provision that innovative elements will be included in the wind farm such as for example the installation and testing of one, two, or three innovative Wind Turbine Generators (WTG’s).
An innovative WTG for the purpose of this tender is defined as:
1. an offshore WTG with a capacity of …
Bekijk de aanbesteding »
2011-11-15Market Consultation Wind Park Maasvlakte 2 (Havenbedrijf Rotterdam N.V.)
The Port of Rotterdam Authority and the Dutch government are investigating the possibilities of realising a wind park on the sea defence of Maasvlakte 2, the large-scale land reclamation for the expansion of the Port of Rotterdam.
The location on the sea defence of Maasvlakte 2 is rather exceptional. It is an on shore location with the potential to generate more than 100 MW of wind energy, with excellent (off shore) wind conditions. On the other hand, a number of issues require attention at this …
Bekijk de aanbesteding »