Recente aankopen van bouwen van thermische centrale in Nederland
2023-01-20General Contractor of the PALLAS Reactor Project (PALLAS)
PALLAS has been established for the realization of a new multifunctional research reactor (PALLAS-reactor) and supporting facilities in Petten, North Holland. PALLAS Reactor Project (Project) is composed of several buildings and ancillaries for production and research of radioisotopes for medical and industrial applications, as well as fuel testing research facilities. The Basic Design activities for the Project are finished in collaboration with the formerly contracted party ICHOS. PALLAS now enters …
Bekijk de aanbesteding »
2018-09-21Green Heat Diemen Civil Works for a biomass fired Heat Only Boiler (N.V. Nuon Energy)
Nuon develops district heating projects in the Amsterdam metropolitan area. The Green Diemen Project, situated in Diemen region is necessary to support the regional growth of residential heat connections and includes a up to 120 MWth Heat Production Facility utilising wood pellets hereafter referred to as GHD, in Diemen.
This tender concerns the Nuon intention to contract the Civil Works required for the premises and the anticipated 120 MWth biomass fired Heat Only Boiler. Main aspects of the foreseen …
Bekijk de aanbesteding »
2018-09-19Green Heat Diemen, biomass fired Heat Only Boiler for District Heating (N.V. Nuon Energy)
This tender relates to Nuon’s intention to develop, design, engineer, construct, commission and deliver a up to 120 MW -biomass fired- heat only boiler at its existing location in Diemen, connected to the Amsterdam area district heating grid. With this new plant, Nuon aims to produce a significant amount of green heat. The heat produced by the new facility will be used to fulfil base load heat demand.
Bekijk de aanbesteding » Genoemde leveranciers:Valmet Technologies OY
2016-03-25EPC Contract for main installations for Project BWI Lage Weide (Eneco Warmteproductie Utrecht B.V.)
The purpose of the tender is to conclude an Agreement with 1 Contractor for Engineering, Procurement, Construction and Commissioning of Main Installations for Biomass heat-plant for Project ‘BWI Lage Weide’ . The Agreement has a term for the duration of the project execution (estimated 2 years) and is expected to take effect as of 1.1.2017. The project will be realised in 2 phases. Phase 1 comprises all site preparations, civil works, biomass storage hall and 1 30-MW boiler unit. Phase 2 will be a future …
Bekijk de aanbesteding » Genoemde leveranciers:Vyncke NV
2016-01-20Future Hemweg, Co-Firing Biomass Logistics 2016 (Nuon Power Generation B.V.)
The project Future Hemweg has the purpose to convert HW08 to a coal and biomass firing plant to increase renewable production in Employer's portfolio and reduce CO2 emissions. The required works, services and supply include but is not limited to, all installations (excluding underground Civil, silo concrete works and integration into existing automation lots) that are required for unloading barges, cleaning of wood pellets, storing of wood pellets. The scope comprises the engineering and design, …
Bekijk de aanbesteding »
2015-11-04Future Hemweg, Co-Firing Biomass Pneumatic feeding and mill conversion (Nuon Power Generation B.V)
The project Future Hemweg has the purpose to convert HW08 to a coal and biomass firing plant to increase renewable production in Employer's portfolio and reduce CO2 emissions.
The required works, services and supply include but is not limited to, all installations and buildings that are required for pneumatic transport of wood pellets to two modified coal mills of HW08, conversion of 2 existing coal mills and modification of 12 burners.
The scope comprises the design, procurement, construction, …
Bekijk de aanbesteding »
2015-10-19Future Hemweg, Co-Firing Biomass Inbound Logistics and Storage (Nuon Power Generation B.V)
The project Future Hemweg has the purpose to convert HW08 to a coal and biomass firing plant to increase renewable production in Employer's portfolio and reduce CO2 emissions. The project consists of the facilities required for co-firing biomass in HW08. This tender includes, but is not limited to, all installations and buildings that are required for unloading barges, cleaning of wood pellets, storing of wood pellets. The scope comprises the engineering and design, procurement, construction, …
Bekijk de aanbesteding »
2015-08-05CHP Conversion Eneco BGR Lot 3, system integration and balance of plant (Eneco Solar, Bio & Hydro BV)
Eneco has the opportunity to supply sustainable produced steam from BGR to the chemical industry park in Delfzijl. For this purpose modifications have to be made to the existing plant to make it possible to supply the steam and receive condensate. This call for tender is specifically published for lot 3 of the project consisting of;- System Integration and Balance of PlantThe description of the work is as follows;Supply of all new facilities forming part of Balance of Plant, and complete system …
Bekijk de aanbesteding »
2013-05-24RWE Technology GmbH (RWE Technology GmbH)
RWE Generation NL (Essent) intends to award contracts for a biomass transport and storage system for biomass pellets for the Eemshaven Biomass co-firing Project at Eemshaven, The Netherlands.
The objective of the project is to co-fire 10 % biomass on a continuous base. This co-firing will take place at the coal-fired power plant being erected at Eemshaven as a twin-unit plant of approximately 780MW each.
The following lots will be contracted within the scope of this publication, either individually or …
Bekijk de aanbesteding »