CHP Conversion Eneco BGR Lot 3, system integration and balance of plant

Eneco Solar, Bio & Hydro BV

Eneco has the opportunity to supply sustainable produced steam from BGR to the chemical industry park in Delfzijl. For this purpose modifications have to be made to the existing plant to make it possible to supply the steam and receive condensate. This call for tender is specifically published for lot 3 of the project consisting of;- System Integration and Balance of PlantThe description of the work is as follows;Supply of all new facilities forming part of Balance of Plant, and complete system Integration into the existing plant to achieve the objective of the project:A) Expand 150 t/h live steam of 90 bar to 35-40 bar via a Pressure Reducing and Desuperheating Station. The resulting steam of 35-40 bar / 300 ยฐC shall be transported via a new pipe towards the (external) steam export pipeline to neighbouring steam client(s). The system boundaries are between the tie-in point on the live steam line and the flange on the external export pipe, located next to the site. B) Condensate return. Receive, store, pump and preheat the return condensate before connection to the tie-in point in the plant. C) The design and installation shall allow integration of steam turbine with 10 kV generator in phase 2 of this project, which will be supplied to the project as a separate lot (third party delivery).The Balance of Plant consists of all Equipment, Piping, Supporting, Foundations, E&CS, Painting & Insulation, etc. to enable the steam flow and condensate return. The scope of services comprises, but is not limited to:- Design and engineering;- Procurement and manufacturing quality control;- Supply and installation of all components for proper functioning including spare parts;- Control system and integration into existing control systems; commissioning, testing and training.- Documentation, certification (PED, etc.), NOBO approval- Project, construction and interface management. Candidates shall demonstrate their EPC project execution capability for multidisciplinary works, including but not limited to Equipment, Piping and Pipe stress, Supporting, Foundations, E&CS, Painting & Insulation, Testing and Commissioning.

Deadline

De termijn voor de ontvangst van de offertes was 2015-09-11. De aanbesteding werd gepubliceerd op 2015-08-05.

Wie? Wat? Waar?
Aankoopgeschiedenis
Datum Document
2015-08-05 Aankondiging van een opdracht
2015-10-08 Aanvullende inlichtingen
Aankondiging van een opdracht (2015-08-05)
Object
Toepassingsgebied van de aanbesteding
Titel: Stoom- en waterbuizen
Hoeveelheid of omvang: 0
Totale waarde van de aanbesteding: 0 ๐Ÿ’ฐ
Aankondigingsmetadata
Originele taal: Engels ๐Ÿ—ฃ๏ธ
Documenttype: Aankondiging van een opdracht
Aard van de opdracht: Werken
Regelgeving: Europese Unie, met GPA-deelname
Gemeenschappelijke woordenlijst overheidsopdrachten (CPV)
Code: Stoom- en waterbuizen ๐Ÿ“ฆ

Procedure
Type procedure: Procedure van gunning via onderhandelingen
Type bod: Inschrijving voor alle percelen
Gunningscriteria
Uit economisch oogpunt voordeligste inschrijving

Aanbestedende dienst
Identiteit
Land: Nederland ๐Ÿ‡ณ๐Ÿ‡ฑ
Type aanbestedende dienst: Nutsbedrijf
Naam aanbestedende dienst: Eneco Solar, Bio & Hydro BV
Postadres: Marten Meesweg 5
Postcode: 3068 AV
Poststad: Rotterdam
Contact
Internetadres: http://www.eneco.com/ ๐ŸŒ
E-mail: vincent.schwerzel@eneco.com ๐Ÿ“ง
Telefoon: +31 630887702 ๐Ÿ“ž

Referentie
Datums
Verzenddatum: 2015-08-05 ๐Ÿ“…
Indieningstermijn: 2015-09-11 ๐Ÿ“…
Publicatiedatum: 2015-08-11 ๐Ÿ“…
Identificatoren
Aankondigingsnummer: 2015/S 153-283065
PB-S nummer: 153
Aanvullende informatie
This procedure is regulated by the Aanbestedingswet 2012.

Object
Toepassingsgebied van de aanbesteding
Korte beschrijving:
Eneco has the opportunity to supply sustainable produced steam from BGR to the chemical industry park in Delfzijl. For this purpose modifications have to be made to the existing plant to make it possible to supply the steam and receive condensate. This call for tender is specifically published for lot 3 of the project consisting of;- System Integration and Balance of PlantThe description of the work is as follows;Supply of all new facilities forming part of Balance of Plant, and complete system Integration into the existing plant to achieve the objective of the project:A) Expand 150 t/h live steam of 90 bar to 35-40 bar via a Pressure Reducing and Desuperheating Station. The resulting steam of 35-40 bar / 300 ยฐC shall be transported via a new pipe towards the (external) steam export pipeline to neighbouring steam client(s). The system boundaries are between the tie-in point on the live steam line and the flange on the external export pipe, located next to the site. B) Condensate return. Receive, store, pump and preheat the return condensate before connection to the tie-in point in the plant. C) The design and installation shall allow integration of steam turbine with 10 kV generator in phase 2 of this project, which will be supplied to the project as a separate lot (third party delivery).The Balance of Plant consists of all Equipment, Piping, Supporting, Foundations, E&CS, Painting & Insulation, etc. to enable the steam flow and condensate return. The scope of services comprises, but is not limited to:- Design and engineering;- Procurement and manufacturing quality control;- Supply and installation of all components for proper functioning including spare parts;- Control system and integration into existing control systems; commissioning, testing and training.- Documentation, certification (PED, etc.), NOBO approval- Project, construction and interface management. Candidates shall demonstrate their EPC project execution capability for multidisciplinary works, including but not limited to Equipment, Piping and Pipe stress, Supporting, Foundations, E&CS, Painting & Insulation, Testing and Commissioning.
Toon meer
Plaats van uitvoering
Hoofdlocatie of plaats van uitvoering: Delfzij, The Netherlands.

Procedure
Geldigheidsduur van de inschrijving: 2016-03-01 ๐Ÿ“…
Datum opening inschrijvingen: 2015-09-14 ๐Ÿ“…
Plaats van opening: Rotterdam.
Plaats: Rotterdam.
Talen
Taal: Engels ๐Ÿ—ฃ๏ธ

Aanbestedende dienst
Contact
Contactpunt: V.P.E. Schwerzel
Adres van het kopersprofiel: http://www.eneco.com/ ๐ŸŒ
URL voor nadere inlichtingen: https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=E6559910-FD63-965B-63DF296E19E9BAE6 ๐ŸŒ
URL van de documenten: https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=E6559910-FD63-965B-63DF296E19E9BAE6 ๐ŸŒ
URL voor deelname: https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=E6559910-FD63-965B-63DF296E19E9BAE6 ๐ŸŒ

Aanvullende informatie
Beoordelingsorgaan
Naam: Rechtbank Rotterdam
Postadres: Postbus 50954
Poststad: Rotterdam
Postcode: 3007BR
Land: Nederland ๐Ÿ‡ณ๐Ÿ‡ฑ
E-mail: rechtbankrotterdam@rechtspraak.nl ๐Ÿ“ง
Telefoon: +31 102972198 ๐Ÿ“ž
Internetadres: https://www.rechtspraak.nl/Organisatie/Rechtbanken/Rotterdam ๐ŸŒ
Fax: +31 102972501 ๐Ÿ“ 
Informatie over termijnen voor beroep: 20 (twenty) calender days from the date of document stating the decision.
Bron: OJS 2015/S 153-283065 (2015-08-05)
Aanvullende inlichtingen (2015-10-08)
Object
Aankondigingsmetadata
Documenttype: Aanvullende inlichtingen

Referentie
Datums
Verzenddatum: 2015-10-08 ๐Ÿ“…
Indieningstermijn: 2015-11-09 ๐Ÿ“…
Publicatiedatum: 2015-10-14 ๐Ÿ“…
Identificatoren
Aankondigingsnummer: 2015/S 199-362069
Verwijst naar aankondiging: 2015/S 153-283065
PB-S nummer: 199
Bron: OJS 2015/S 199-362069 (2015-10-08)