Recente aankopen van installatie van gasturbines in Nederland
2021-10-15Replacement Combustion System Frame 9/E Gas Turbine RoCa 3 2023 (Uniper Benelux N.V.)
On our Uniper Benelux (UBX) location RoCa3 at Rotterdam we have stationed a Frame9/E gas turbine with generator. In 2023 there is a change from Low Caloric Gas to High Caloric Gas planned for the unit. Instead of only changing the fuel nozzles we want to prepare the unit for the future with emission reduction and the possibility to run partly on Hydrogen. During the available time of a Combustion Inspection we want to have replaced the existing DLN-1 system with a new Combustion System together with fuel โฆ
Bekijk de aanbesteding ยป Genoemde leveranciers:Thomassen Energy B.V.
2016-04-22Nuon Blackstart Eemshaven (NV Nuon Energy)
Relocatie van GE frame 6 gas turbine van Thyrow Duitsland of Almere Nederland naar Eemshaven, Nederland. Inclusief inspectie, revisie, refurbishment, modificatie, reparatie en ingebruikstelling.
Bekijk de aanbesteding ยป
2015-08-05CHP Conversion Eneco BGR Lot 3, system integration and balance of plant (Eneco Solar, Bio & Hydro BV)
Eneco has the opportunity to supply sustainable produced steam from BGR to the chemical industry park in Delfzijl. For this purpose modifications have to be made to the existing plant to make it possible to supply the steam and receive condensate. This call for tender is specifically published for lot 3 of the project consisting of;- System Integration and Balance of PlantThe description of the work is as follows;Supply of all new facilities forming part of Balance of Plant, and complete system โฆ
Bekijk de aanbesteding ยป