2021-10-15   Replacement Combustion System Frame 9/E Gas Turbine RoCa 3 2023 (Uniper Benelux N.V.)
On our Uniper Benelux (UBX) location RoCa3 at Rotterdam we have stationed a Frame9/E gas turbine with generator. In 2023 there is a change from Low Caloric Gas to High Caloric Gas planned for the unit. Instead of only changing the fuel nozzles we want to prepare the unit for the future with emission reduction and the possibility to run partly on Hydrogen. During the available time of a Combustion Inspection we want to have replaced the existing DLN-1 system with a new Combustion System together with fuel … Bekijk de aanbesteding »
Genoemde leveranciers: Thomassen Energy B.V.
2021-03-10   Major Overhaul Frame 9 Gas Turbine Rotterdam Capelle (RoCa) (Uniper Benelux nv)
Major overhaul of a gas turbine at Rotterdam Capelle. Bekijk de aanbesteding »
2017-02-15   Onderhoud diverse turbines (Twence BV)
Twence is een afval energie bedrijf met o.a. 3 Afval Energie Centrales en 1 Bio Energie Centrale. Om vanuit afval energie te maken bedrijven we een drietal stoomturbines van het condensatie type in de range van 20 tot 26 MW. Een vierde turbine is nu in productie en zal in het 1e kwartaal 2018 in bedrijf worden genomen. De nieuwe zal de huidige turbine van de Bio Energie Centrale vervangen. De huidige turbine zal eind 2017 uitbedrijf worden genomen en worden geconserveerd. Met deze vervanging is het na … Bekijk de aanbesteding »
Genoemde leveranciers: Stork Turbo Service B.V.
2016-04-22   Nuon Blackstart Eemshaven (NV Nuon Energy)
Relocatie van GE frame 6 gas turbine van Thyrow Duitsland of Almere Nederland naar Eemshaven, Nederland. Inclusief inspectie, revisie, refurbishment, modificatie, reparatie en ingebruikstelling. Bekijk de aanbesteding »
2015-08-05   CHP Conversion Eneco BGR Lot 3, system integration and balance of plant (Eneco Solar, Bio & Hydro BV)
Eneco has the opportunity to supply sustainable produced steam from BGR to the chemical industry park in Delfzijl. For this purpose modifications have to be made to the existing plant to make it possible to supply the steam and receive condensate. This call for tender is specifically published for lot 3 of the project consisting of;- System Integration and Balance of PlantThe description of the work is as follows;Supply of all new facilities forming part of Balance of Plant, and complete system … Bekijk de aanbesteding »