2019-06-18Design, Construct and Installation Sludge Belt Drying Plant (HVC Groep)
One of the HVC shareholding waterboards has indicated that they will shut down their sludge drying facility in order to reduce their consumption of natural gas. In order to achieve this HVC and their share holder have indicated to develop a new sludge drying facility on the HVC waste incineration plant premises in Alkmaar. The facility will be drying the sludge with heat from the waste incineration plant. Sludge will be dried in this new facility from begin 2022.
Bekijk de aanbesteding »