Recente aankopen van windenergiegeneratoren in Nederland
2020-07-10Windfarm Zutphen and Duiven (Waterschap Rijn en IJssel)
Water board Rijn and IJssel
'With more than 375 employees, water board Rijn and IJssel take care of water management in a part of The Netherlands which can be defined as the East of Gelderland, the south of Overijssel and the south-east of the Veluwe. In this area, the water board ensures safety of the dikes and quays, the purification of waste water from residents and companies, sufficient and high-quality surface water and keeping the Oude Ijssel navigable for ships.' See also www.wrij.nl
Purpose of …
Bekijk de aanbesteding » Genoemde leveranciers:Enercon GmbH - Dutch Branch
2018-01-316-L-90085-18 Marktconsultatie strategie energie-inkoop vanaf 2020 (Gemeente Rotterdam)
Ter voorbereiding op een eventuele aanbesteding organiseert de gemeente Rotterdam een marktconsultatie. Een marktconsultatie is een door de gemeente Rotterdam georganiseerde informatie-uitwisseling met partijen welke opereren in de relevante markt. De gemeente Rotterdam wil de verkregen informatie gebruiken om een marktgerichte en realistische aanbesteding in de markt te zetten. De marktverkenning stelt de gemeente Rotterdam tevens in staat om inzicht te verkrijgen in welke mate aanbieders van duurzame, …
Bekijk de aanbesteding »
2017-10-06Onshore Maintenance and Service Works for Prinses Alexia (N.V. Nuon Energy)
This Tender concerns the provision of support services for Onshore Maintenance and Service Works for Prinses Alexia Wind Farm including but not limited to scheduled maintenance and unscheduled maintenance, as well as additional services such as provision of additional personnel, main component exchange and major repairs, provision of Parts. The goal of this tender is to enter into a contract with 1 or 2 parties for the term of 2 years with option to prolong the agreement for a period of 1 more year.
Bekijk de aanbesteding »
2017-08-02Gearbox supply and refurbishment Prinses Amaliawindpark (Eneco Windmolens Offshore B.V.)
The anticipated scope of work of the Candidate comprises of providing gearboxes for the purpose of exchange on the WTGs in Prinses Amaliawindpark. This includes maintaining a stock/pool of 3 to 4 gearboxes and additional supply of up to 2 gearboxes per campaign.
The total number of gearboxes that are expected to be replaced (within the 5 year contract period) is 24-40 gearboxes.
Bekijk de aanbesteding »
2017-02-15Onderhoud diverse turbines (Twence BV)
Twence is een afval energie bedrijf met o.a. 3 Afval Energie Centrales en 1 Bio Energie Centrale.
Om vanuit afval energie te maken bedrijven we een drietal stoomturbines van het condensatie type in de range van 20 tot 26 MW.
Een vierde turbine is nu in productie en zal in het 1e kwartaal 2018 in bedrijf worden genomen.
De nieuwe zal de huidige turbine van de Bio Energie Centrale vervangen. De huidige turbine zal eind 2017 uitbedrijf worden genomen en worden geconserveerd.
Met deze vervanging is het na …
Bekijk de aanbesteding » Genoemde leveranciers:Stork Turbo Service B.V.
2016-12-12EWTW-II — Wind Turbines (ECN Wind Energy Facilities B.V.)
The design, engineering, manufacturing, transportation, installation, installation equipment, commissioning, construction, operation and maintenance of the 8 Wind Turbine Generators in the EWTW II project, including the foundations, the crane hardstands and the roads required for the installation and the maintenance of the Wind Turbine Generators.
Bekijk de aanbesteding »
2016-03-07Balance of Plant Nuon Windpark Wieringermeer (Nuon Windpark Wieringermeer B.V.)
The scope of work of this tender: Engineering, Procurement and Construction of the Balance of Plant which includes project management, design, engineering, procurement and construction of access roads, crane hard stands, wind turbine foundations, internal grid, terminations including those to the public grid and substations for the Nuon Windpark Wieringermeer.
Bekijk de aanbesteding »
2016-02-01Wind Turbines Supply and Service Nuon Windpark Wieringermeer (N.V. Nuon Energy)
The scope of work of this tender includes the design, engineering, manufacturing, fabrication, installation, installation equipment, transportation, commissioning and maintenance of the WTGs (excluding foundations). The tender process will result in 2 contracts: 1 turbine supply agreement and 1 service agreement. The 2 contracts will be entered into with the same supplier.
Bekijk de aanbesteding » Genoemde leveranciers:Nordex Energy GmbH
2014-05-22Inspection and maintenance for balance of plant for two Dutch offshore wind farms (N.V. Eneco Beheer)
The offshore wind farms Prinses Amaliawindpark (operational since July 2008) and Eneco Luchterduinen (anticipated start of operational phase: mid 2015) require inspection and maintenance of its Balance of Plant. The Balance of Plant is for this tender defined as the wind turbine foundations and the OHVS foundation (below and above water and primary and secondary steel and cathodic protection), the outside steel structure of the OHVS topside, scour protection, infield and export cable. The philosophy of …
Bekijk de aanbesteding »
2014-01-17Aanbesteding Concessie Windturbines Hazeldonk (Gemeente Breda)
De gemeente Breda heeft ambitieuze duurzaamheiddoelstellingen: in 2044 energieneutraal, in 2020 30 % CO2-reductie ten opzichte van 1990, in 2020 20 % duurzame energie in de energievoorziening en minimaal 2 % efficiencyverbetering per jaar. Om deze doelstellingen te halen is de realisatie van windenergieprojecten onontbeerlijk. Op het bedrijventerrein Hazeldonk (onderdeel van het grensoverschrijdende Logistics Center Hazeldonk-Meer) is een planologische procedure doorlopen om het bestemmingsplan zodanig …
Bekijk de aanbesteding » Genoemde leveranciers:Samenwerkingsverband DunoAir BV en...
2013-11-28Wind Turbine Generator Package (Vattenfall Vindkraft A/S)
Vattenfall intents to participate in the call for bids for the concession of offshore wind farm Horns Rev 3 concession, led by the DEA [Danish Energy Agency]. This wind farm will have a capacity of maximum 400 MW and will consist of foundations, wind turbine generators and inter array cables.
The total scope of works of this tender includes the design, engineering, manufacturing, fabrication, supply, installation, commissioning and operation and maintenance of the offshore wind turbine generators for the …
Bekijk de aanbesteding »
2012-03-05Provision of scheduled and unscheduled maintenance of wind turbine generator (WTG) (N.V. Nuon Duurzame Energie)
There are 7 windparks with different number of turbines of different types / manufacturers. All these windparks are out of warranty. We are looking for contractors who can provide us with maintenance work. The contractor shall provide to the contracting entity during the term all work, supplies and services that are required to keep the turbines required to keep the turbines operational and in good condition. The contract will include scheduled maintenance as described in the service and maintenance …
Bekijk de aanbesteding »
2012-01-18Design, Build (Supply, Fabrication and Installation), Operate and/or Maintain of one, two or three innovative wind... (Q10 Offshore Wind BV)
Contracting Entity has obtained a concession for the construction of an offshore wind farm in the Dutch Exclusive Economic Zone in the Q10 sector. The Q10 project has obtained a subsidy from the Dutch authorities under the provision that innovative elements will be included in the wind farm such as for example the installation and testing of one, two, or three innovative Wind Turbine Generators (WTG’s).
An innovative WTG for the purpose of this tender is defined as:
1. an offshore WTG with a capacity of …
Bekijk de aanbesteding »
2011-11-15Market Consultation Wind Park Maasvlakte 2 (Havenbedrijf Rotterdam N.V.)
The Port of Rotterdam Authority and the Dutch government are investigating the possibilities of realising a wind park on the sea defence of Maasvlakte 2, the large-scale land reclamation for the expansion of the Port of Rotterdam.
The location on the sea defence of Maasvlakte 2 is rather exceptional. It is an on shore location with the potential to generate more than 100 MW of wind energy, with excellent (off shore) wind conditions. On the other hand, a number of issues require attention at this …
Bekijk de aanbesteding »