Offshore Grid NL โ€” Offshore Route Survey activities (Non-UXO)

TenneT TSO BV

The law โ€˜Wind energy at Sea (Windenergie op Zee)โ€™ of 1.7.2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network.
On 27.3.2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced โ€˜Roadmap windenergie op zee 2030โ€™, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]:
Hollandse Kust (west) Beta- HKW beta โ€” 0,7 GW.
Ten noorden van de Waddeneilanden โ€” TNW 0,7 GW.
IJmuiden Ver Alpha โ€” IJV alpha โ€” 2 GW.
IJmuiden Ver Beta โ€” IJV Beta โ€” 2 GW.
[1] The Roadmap 2030 includes the wind area Hollandse Kust West alpha, but this is not part of this tender.

Deadline

De termijn voor de ontvangst van de offertes was 2019-10-16. De aanbesteding werd gepubliceerd op 2019-09-16.

Leveranciers

De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:

Wie? Wat? Waar?
Aankoopgeschiedenis
Datum Document
2019-09-16 Aankondiging van een opdracht
2020-06-24 Award Aankondiging
Aankondiging van een opdracht (2019-09-16)
Object
Toepassingsgebied van de aanbesteding
Titel: Offshorediensten
Referentienummer: 122309
Korte beschrijving:
The law โ€˜Wind energy at Sea (Windenergie op Zee)โ€™ of 1.7.2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network. On 27.3.2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced โ€˜Roadmap windenergie op zee 2030โ€™, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]: Hollandse Kust (west) Beta- HKW beta โ€” 0,7 GW. Ten noorden van de Waddeneilanden โ€” TNW 0,7 GW. IJmuiden Ver Alpha โ€” IJV alpha โ€” 2 GW. IJmuiden Ver Beta โ€” IJV Beta โ€” 2 GW. [1] The Roadmap 2030 includes the wind area Hollandse Kust West alpha, but this is not part of this tender.
Toon meer
Aankondigingsmetadata
Originele taal: Engels ๐Ÿ—ฃ๏ธ
Documenttype: Aankondiging van een opdracht
Aard van de opdracht: Diensten
Regelgeving: Europese Unie, met GPA-deelname
Gemeenschappelijke woordenlijst overheidsopdrachten (CPV)
Code: Offshorediensten ๐Ÿ“ฆ
Aanvullende CPV-code: Offshorediensten ๐Ÿ“ฆ
Plaats van uitvoering
NUTS-regio: Nederland ๐Ÿ™๏ธ

Procedure
Type procedure: Procedure van gunning via onderhandelingen
Type bod: Inschrijving voor alle percelen
Gunningscriteria
Uit economisch oogpunt voordeligste inschrijving

Aanbestedende dienst
Identiteit
Land: Nederland ๐Ÿ‡ณ๐Ÿ‡ฑ
Type aanbestedende dienst: Nutsbedrijf
Naam aanbestedende dienst: TenneT TSO bv
Postadres: Utrechtseweg 310
Postcode: 6812 AR
Poststad: Arnhem
Contact
Internetadres: http://www.tennet.eu ๐ŸŒ
E-mail: michel.de.wild@tennet.eu ๐Ÿ“ง
Telefoon: +31 263731266 ๐Ÿ“ž
URL van de documenten: https://platform.negometrix.com/PublishedTenders.aspx?tenderid=122309 ๐ŸŒ

Referentie
Datums
Verzenddatum: 2019-09-16 ๐Ÿ“…
Indieningstermijn: 2019-10-16 ๐Ÿ“…
Publicatiedatum: 2019-09-20 ๐Ÿ“…
Startdatum: 2020-04-01 ๐Ÿ“…
Einddatum: 2030-04-01 ๐Ÿ“…
Identificatoren
Aankondigingsnummer: 2019/S 182-444485
Verwijst naar aankondiging: 2019/S 157-387888
PB-S nummer: 182

Object
Toepassingsgebied van de aanbesteding
Korte beschrijving:
The law โ€˜Wind energy at Sea (Windenergie op Zee)โ€™ of 1.7.2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network.
Toon meer
On 27.3.2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced โ€˜Roadmap windenergie op zee 2030โ€™, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]:
Hollandse Kust (west) Beta- HKW beta โ€” 0,7 GW.
Ten noorden van de Waddeneilanden โ€” TNW 0,7 GW.
IJmuiden Ver Alpha โ€” IJV alpha โ€” 2 GW.
IJmuiden Ver Beta โ€” IJV Beta โ€” 2 GW.
[1] The Roadmap 2030 includes the wind area Hollandse Kust West alpha, but this is not part of this tender.
Off-and nearshore route surveys.
Plaats van uitvoering
Hoofdlocatie of plaats van uitvoering: NL.

Procedure
Rechtsgrondslag: 32014L0025
Datum van verzending van uitnodigingen: 2019-11-08 ๐Ÿ“…
Talen waarin inschrijvingen of aanvragen tot deelneming kunnen worden ingediend: Engels ๐Ÿ—ฃ๏ธ
Geldigheidsduur van de inschrijving: 3 maanden

Aanbestedende dienst
Identiteit
Nationaal registratienummer: 09155985
Contact
Contactpunt: Michel de Wild
Adres van het kopersprofiel: https://platform.negometrix.com/PublishedTenders.aspx?tenderid=122309 ๐ŸŒ
Documenten URL: https://platform.negometrix.com/PublishedTenders.aspx?tenderid=122309 ๐ŸŒ

Aanvullende informatie
Beoordelingsorgaan
Naam: Juridicial Court Arnhem
Postadres: Walburgstraat 2-4
Poststad: Arnhem
Postcode: 6811 CD
Land: Nederland ๐Ÿ‡ณ๐Ÿ‡ฑ
Telefoon: +31 883612000 ๐Ÿ“ž
Internetadres: www.rechtspraak.nl ๐ŸŒ
Informatie over termijnen voor beroep:
Candidate will be informed of the conditional selection decision at the earliest possible opportunity. If candidates object to the conditional selection decision, they must make their objections known to TenneT within 20 (twenty) days of the day after the day the conditional selection decision has been sent via Negometrix by serving an application for interim measures before the competent preliminary injunctions court at Arnhem. If a candidate initiates legal proceedings in connection with the selection decision after these 20 days, TenneT will adopt the position that the candidate has inadmissible claims. This period must therefore be regarded as a time-limit.
Toon meer
Bron: OJS 2019/S 182-444485 (2019-09-16)
Award Aankondiging (2020-06-24)
Object
Toepassingsgebied van de aanbesteding
Korte beschrijving:
The law โ€˜Wind energy at Sea (Windenergie op Zee)โ€™ of 1 July 2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network. On 27 March 2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced โ€˜Roadmap windenergie Op zee 2030โ€™, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]: Hollandse Kust (west) Beta โ€” HKW beta โ€” 0.7 GW Ten noorden van de Waddeneilanden โ€” TNW โ€” 0.7 GW IJmuiden Ver Alpha โ€” IJV alpha โ€” 2 GW IJmuiden Ver Beta โ€” IJV Beta โ€” 2 GW [1] The Roadmap 2030 includes the wind area Hollandse Kust West alpha, but this is not part of this tender.
Toon meer
Aankondigingsmetadata
Documenttype: Award Aankondiging

Procedure
Type bod: Niet van toepassing

Aanbestedende dienst
Identiteit
Naam aanbestedende dienst: TenneT TSO B.V.
Contact
E-mail: will.vander.worp@tennet.eu ๐Ÿ“ง
Telefoon: +31 889367349 ๐Ÿ“ž

Referentie
Datums
Verzenddatum: 2020-06-24 ๐Ÿ“…
Publicatiedatum: 2020-06-26 ๐Ÿ“…
Identificatoren
Aankondigingsnummer: 2020/S 122-300272
Verwijst naar aankondiging: 2019/S 182-444485
PB-S nummer: 122

Object
Toepassingsgebied van de aanbesteding
Korte beschrijving:
The law โ€˜Wind energy at Sea (Windenergie op Zee)โ€™ of 1 July 2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network.
Toon meer
On 27 March 2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced โ€˜Roadmap windenergie Op zee 2030โ€™, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]:
Hollandse Kust (west) Beta โ€” HKW beta โ€” 0.7 GW
Ten noorden van de Waddeneilanden โ€” TNW โ€” 0.7 GW
IJmuiden Ver Alpha โ€” IJV alpha โ€” 2 GW
IJmuiden Ver Beta โ€” IJV Beta โ€” 2 GW
Plaats van uitvoering
Hoofdlocatie of plaats van uitvoering: NL

Gunning van het contract
Datum van sluiting van de overeenkomst: 2020-03-09 ๐Ÿ“…
Naam: Next Geosolutions ร‰urope SpA
Postadres: Via Santa Brigida 39
Poststad: Napoli
Postcode: 80133
Land: Nederland ๐Ÿ‡ณ๐Ÿ‡ฑ
E-mail: nextgeosolutions@pec.it ๐Ÿ“ง
Naam: Fugro Netherlands Marine B.V.
Poststad: Nootdorp
Informatie over aanbestedingen
Aantal ontvangen offertes: 4

Aanbestedende dienst
Identiteit
Nationaal registratienummer: 531969787
Contact
Contactpunt: Will van der Worp

Referentie
Aanvullende informatie
Next Geosolutions ร‰urope SpA has their registered office in Italy (IT).
As stated in the tender documents Tennet TSO B.V. has also awarded a back-up agreement. The back-up agreement has been awarded to: Fugro Netherlands Marine B.V. / Nootdorp / The Netherlands.

Aanvullende informatie
Beoordelingsorgaan
Naam: Court of Arnhem
Bron: OJS 2020/S 122-300272 (2020-06-24)