The project Future Hemweg has the purpose to convert HW08 to a coal and biomass firing plant to increase renewable production in Employer's portfolio and reduce CO2 emissions.
The required works, services and supply include but is not limited to, all installations and buildings that are required for pneumatic transport of wood pellets to two modified coal mills of HW08, conversion of 2 existing coal mills and modification of 12 burners.
The scope comprises the design, procurement, construction, commissioning, testing and optional maintenance of the Works.
Deadline
De termijn voor de ontvangst van de offertes was 2015-12-21.
De aanbesteding werd gepubliceerd op 2015-11-04.
The project Future Hemweg has the purpose to convert HW08 to a coal and biomass firing plant to increase renewable production in Employer's portfolio and reduce CO emissions.
The required works, services and supply include but is not limited to, all installations and buildings that are required for pneumatic transport of wood pellets to 2 modified coal mills of HW08, conversion of 2 existing coal mills and modification of 12 burners.
The scope comprises the design, procurement, construction, commissioning, testing and optional maintenance of the Works.
The required works, services and supply include but is not limited to, all installations and buildings that are required for pneumatic transport of wood pellets to two modified coal mills of HW08, conversion of two existing coal mills and modification of 12 burners.
The scope comprises the design, procurement, construction, commissioning, testing and optional maintenance of the Works.
The Works are including, but not limited to:
โ Intermediate silo;
โ Pneumatic transport;
โ Conversion of 2 existing coal mills;
โ Modification of 12 burners;
โ Determination of DCS programme for converted mills and burners;
โ Necessary and related civil works, i.e. piling and foundations;
โ All other components and systems required for safe and reliable operation and maintenance.
The anticipated contract duration is based on:
โ 2 year realisation (engineering start-up โ commissioning);
โ 6 months operational testing and take over;
โ 2 years defects notification period;
โ 5 years maximum maintenance.
Toon meer Gunningscriteria
Kwaliteitscriterium (naam): Project plan
Kwaliteitscriterium (weging): 20
Kwaliteitscriterium (naam): Technical concept
Kostencriterium (naam): Tco-npv
Kostencriterium (weging): 60
Informatie over opties
Opties โ
Beschrijving van de opties: Employer may decide to contract 5 years maintenance with Contractor.
Procedure Soort procedure
Beperkte procedure
Administratieve informatie
Eerdere publicatie betreffende deze procedure: 2015/S 216-394870
Gunning van het contract
1๏ธโฃ Informatie over niet-toekenning
Andere redenen (stopzetting van de procedure)