2018-10-19RFI Waterboor Installaties NL Krijgsmacht (Ministerie van Defensie)
This Negometrix Tender entails a Request for Information for water well drilling rigs for the Royal Netherlands Armed Forces.
2 large water well drilling rigs and 1 small water well drilling rig.
The RFI documents are enclosed in this Nx dossier.
Entrepreneurs who would like more information about the use of Negometrix can consult various
instructions at:
https://negometrix.com/nl/instruction-page/leveranciers
Bekijk de aanbesteding »
2014-05-22Inspection and maintenance for balance of plant for two Dutch offshore wind farms (N.V. Eneco Beheer)
The offshore wind farms Prinses Amaliawindpark (operational since July 2008) and Eneco Luchterduinen (anticipated start of operational phase: mid 2015) require inspection and maintenance of its Balance of Plant. The Balance of Plant is for this tender defined as the wind turbine foundations and the OHVS foundation (below and above water and primary and secondary steel and cathodic protection), the outside steel structure of the OHVS topside, scour protection, infield and export cable. The philosophy of …
Bekijk de aanbesteding »