2014-09-12   Supply, installation and maintenance of a 75 kW/150 kWh battery storage system for grid-connected and island... (European Commission, Joint Research Centre, Institute for Energy and Transport)
Increased penetration of renewable energy sources in electricity networks results in growing power production variability. Hence reliable balancing technologies are required a) to provide extra power when RES power production is too low; and b) to store energy when there is a surplus of produced RES power. This balancing task can be provided by energy storage technologies, not only in transmission and distribution grids but also in smaller-scale networks. The requested battery storage system must allow … Bekijk de aanbesteding »
Genoemde leveranciers: Ingeteam Power Technology
2014-06-06   Supply, installation and maintenance of a 50 kW/150 kWh battery storage system for grid-connected and island... (European Commission, Joint Research Centre, Institute for Energy and Transport)
Increased penetration of renewable energy sources in electricity networks results in growing power production variability. Hence reliable balancing technologies are required a) to provide extra power when RES power production is too low and b) to store energy when there is a surplus of produced RES power. This balancing task can be provided by energy storage technologies, not only in transmission and distribution grids but also in smaller-scale networks. The requested battery storage system must allow … Bekijk de aanbesteding »
2013-09-30   Raamcontract UCP (N.V. Nederlandse Gasunie)
The scope for this European tender is the retrofit of UCP's for gasturbine driven gas compression units. The UCP's are situated in the Netherlands on gas compression plants owned by Gasunie. The retrofit covers replacement of the complete UCP and optionally the field instrumentation. The retrofit includes engineering, assembling, FAT, delivery onsite, installation, commissioning, start-up and SAT. Documentation and drawings are part of the scope. On request of Gasunie the supplier should be able to give … Bekijk de aanbesteding »
2012-08-02   Distributed 380kV cable temperature monitoring and rating (TenneT TSO B.V.)
TenneT has installed the 380kV high voltage connection 'Randstad380', which is a 380 kV high voltage connection including cables. Although several 380 kV cable projects have been realized in Europe, the operation experiences of this kind of cable in meshed networks are very limited in general. Operation time is relatively short and behaviour of this kind of cables in 380 kV transmission systems is not clear. Therefore, TenneT has defined a research program in which the behaviour of long 380 kV cable … Bekijk de aanbesteding »
2012-06-01   Powercable connection monitoring system (TenneT TSO B.V.)
Powercable connection monitoring system for 380kV high voltage cable. Several 380 kV XLPE cable projects have been realized in Europe, the operation experiences of this kind of cable in meshed networks are however very limited in general. Operation time is relatively short and behaviour of this kind of cables in 380 kV transmission systems is not clear. TenneT has asked to proof the theoretical models on system level using off-line or on-line measurements. To be able to measure a monitoring/measuring … Bekijk de aanbesteding »
2012-02-07   Solar Simulator (Energy research Centre of the Netherlands)
Spectrally adjustable Solar Simulator to measure IV characteristics of thin film tandem solar cells and modules on an area of 30x30 cm. Bekijk de aanbesteding »
Genoemde leveranciers: Neonsee GmbH