Recente aankopen door NS Group N.V. / NedTrain B.V.
2016-10-06Airco Tubs (NS Group N.V. / NedTrain B.V.)
The air conditioning shell of the VIRM trainsets consists of three major parts:
โ A tub, collects the water (rain and condensate) and drains and the air flow passed through condensers and heaters;
โ A frame as a load-bearing structure and for the attachment of components such as the compressor and capacitors;
โ A cover for guiding the air flow and a walkway at the roof.
During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The โฆ
Bekijk de aanbesteding ยป