The air conditioning shell of the VIRM trainsets consists of three major parts: โ A tub, collects the water (rain and condensate) and drains and the air flow passed through condensers and heaters; โ A frame as a load-bearing structure and for the attachment of components such as the compressor and capacitors; โ A cover for guiding the air flow and a walkway at the roof. During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The tubs are strongly corroded in several places, with the result that all original IRM tubs must be replaced. It concerns here 3 types of tubs (divided over three variants โ type 101, type 102, type 103). It concerns the supply of basic tubs, final assembly will be executed by NedTrain. All the specifications are quantified and prepared for production. Changes or adjustments to the product or materials are not desirable. The work scope consist. โ Machining aluminum plates โ Welding aluminum parts โ Conservation work /Apply Coating.
Deadline
De termijn voor de ontvangst van de offertes was 2016-11-18.
De aanbesteding werd gepubliceerd op 2016-10-06.
Aankondiging van een opdracht (2016-10-06) Object Toepassingsgebied van de aanbesteding
Titel: Onderdelen van locomotieven of rollend materieel
Hoeveelheid of omvang: See selection guidelines.
Aankondigingsmetadata
Originele taal: Engels ๐ฃ๏ธ
Documenttype: Aankondiging van een opdracht
Aard van de opdracht: Leveringen
Regelgeving: Europese Unie, met GPA-deelname
Gemeenschappelijke woordenlijst overheidsopdrachten (CPV)
Code: Onderdelen van locomotieven of rollend materieel๐ฆ
Procedure
Type procedure: Openbare procedure
Type bod: Inschrijving voor alle percelen
Gunningscriteria
Uit economisch oogpunt voordeligste inschrijving
Aanbestedende dienst Identiteit
Land: Nederland ๐ณ๐ฑ
Type aanbestedende dienst: Nutsbedrijf
Naam aanbestedende dienst: NS Group N.V. / NedTrain B.V.
Postadres: Stationshal 17
Postcode: 3511CE
Poststad: Utrecht
Contact
Internetadres: http://www.ns.nl๐
E-mail: procurementsupport@ns.nl๐ง
Telefoon: +31 302353897๐
Object Toepassingsgebied van de aanbesteding
Korte beschrijving:
The air conditioning shell of the VIRM trainsets consists of three major parts:
โ A tub, collects the water (rain and condensate) and drains and the air flow passed through condensers and heaters;
โ A frame as a load-bearing structure and for the attachment of components such as the compressor and capacitors;
โ A cover for guiding the air flow and a walkway at the roof.
During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The tubs are strongly corroded in several places, with the result that all original IRM tubs must be replaced. It concerns here 3 types of tubs (divided over three variants โ type 101, type 102, type 103). It concerns the supply of basic tubs, final assembly will be executed by NedTrain. All the specifications are quantified and prepared for production. Changes or adjustments to the product or materials are not desirable. The work scope consist.
During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The tubs are strongly corroded in several places, with the result that all original IRM tubs must be replaced. It concerns here 3 types of tubs (divided over three variants โ type 101, type 102, type 103). It concerns the supply of basic tubs, final assembly will be executed by NedTrain. All the specifications are quantified and prepared for production. Changes or adjustments to the product or materials are not desirable. The work scope consist.
โ Machining aluminum plates
โ Welding aluminum parts
โ Conservation work /Apply Coating.
Duur: 60 maanden Plaats van uitvoering
Hoofdlocatie of plaats van uitvoering: Berkel Enschot.
Juridische, economische, financiรซle en technische informatie Uitvoering van de opdracht
Andere bijzondere voorwaarden:
Requirement: minimal requirements
Description: For the minimum requirements, see the tender documents. The tender documents can be requested by sending an email, including the contact details of your organization, to procurementsupport@ns.nl. You will find the login details for Ariba Sourcing in the mail you receive in return. By logging in with this data, you can see the tender documents.
Description: For the minimum requirements, see the tender documents. The tender documents can be requested by sending an email, including the contact details of your organization, to procurementsupport@ns.nl. You will find the login details for Ariba Sourcing in the mail you receive in return. By logging in with this data, you can see the tender documents.
Notes to Document: For the minimum requirements, see the tender documents. The tender documents can be requested by sending an email, including the contact details of your organization, to procurementsupport@ns.nl. You will find the login details for Ariba Sourcing in the mail you receive in return. By logging in with this data, you can see the tender documents.
Notes to Document: For the minimum requirements, see the tender documents. The tender documents can be requested by sending an email, including the contact details of your organization, to procurementsupport@ns.nl. You will find the login details for Ariba Sourcing in the mail you receive in return. By logging in with this data, you can see the tender documents.
Procedure
Geldigheidsduur van de inschrijving: 60 maanden
Datum opening inschrijvingen: 2016-11-18 ๐
Gunningscriteria
Criterium: 1. Criteria: Airco Tubs Description: see, awarding guidline Requirements:
Talen
Taal: Engels ๐ฃ๏ธ
Nederlands ๐ฃ๏ธ
Aanvullende informatie Beoordelingsorgaan
Naam: Rechtbank Midden Nederland
Postadres: Vrouwe Justitiaplein 1
Poststad: Utrecht
Postcode: 3511 EX
Land: Nederland ๐ณ๐ฑ
Bron: OJS 2016/S 196-354508 (2016-10-06)
Award Aankondiging (2017-01-24) Object Toepassingsgebied van de aanbesteding
Korte beschrijving:
The air conditioning shell of the VIRM trainsets consists of 3 major parts:
โ A tub, collects the water (rain and condensate) and drains and the air flow passed through condensers and heaters;
โ A frame as a load-bearing structure and for the attachment of components such as the compressor and capacitors;
โ A cover for guiding the air flow and a walkway at the roof.
During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The tubs are strongly corroded in several places, with the result that all original IRM tubs must be replaced. It concerns here 3 types of tubs (divided over 3 variants โ type 101, type 102, type 103). It concerns the supply of basic tubs, final assembly will be executed by NedTrain. All the specifications are quantified and prepared for production. Changes or adjustments to the product or materials are not desirable. The work scope consist.
โ Machining aluminum plates;
โ Welding aluminum parts;
โ Conservation work /Apply Coating.
The air conditioning shell of the VIRM trainsets consists of 3 major parts:
โ A tub, collects the water (rain and condensate) and drains and the air flow passed through condensers and heaters;
โ A frame as a load-bearing structure and for the attachment of components such as the compressor and capacitors;
โ A cover for guiding the air flow and a walkway at the roof.
During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The tubs are strongly corroded in several places, with the result that all original IRM tubs must be replaced. It concerns here 3 types of tubs (divided over 3 variants โ type 101, type 102, type 103). It concerns the supply of basic tubs, final assembly will be executed by NedTrain. All the specifications are quantified and prepared for production. Changes or adjustments to the product or materials are not desirable. The work scope consist.
โ Machining aluminum plates;
โ Welding aluminum parts;
โ Conservation work /Apply Coating.
Aankondigingsmetadata
Documenttype: Award Aankondiging
Plaats van uitvoering
NUTS-regio: Nederland
๐๏ธ
Object Toepassingsgebied van de aanbesteding
Korte beschrijving:
The air conditioning shell of the VIRM trainsets consists of 3 major parts:
During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The tubs are strongly corroded in several places, with the result that all original IRM tubs must be replaced. It concerns here 3 types of tubs (divided over 3 variants โ type 101, type 102, type 103). It concerns the supply of basic tubs, final assembly will be executed by NedTrain. All the specifications are quantified and prepared for production. Changes or adjustments to the product or materials are not desirable. The work scope consist.
During the revision work on the (V) IRM- air conditioning units is an unforeseen problem detected on the tubs (to collect spills). The tubs are strongly corroded in several places, with the result that all original IRM tubs must be replaced. It concerns here 3 types of tubs (divided over 3 variants โ type 101, type 102, type 103). It concerns the supply of basic tubs, final assembly will be executed by NedTrain. All the specifications are quantified and prepared for production. Changes or adjustments to the product or materials are not desirable. The work scope consist.
โ Machining aluminum plates;
โ Welding aluminum parts;
See selection guidelines.
Gunning van het contract
Datum van sluiting van de overeenkomst: 2017-01-23 ๐