Gasunie intends to conclude a contract in which it wants to procure renewable energy produced by Dutch wind farms. The scope of this contract is to establish the delivery of 25 MW as a baseload volume for the first period (1-x-2024 – 31-12-2024) for which the start month is flexible depending on when party can start the delivery of the requested volume. The total volume in period 1 depends on the start date of the contract, but always starting on the first of any given month in 2024. For the remaining 4 years (01-01-2025 till 31-12-2028), a volume of 250 GWh/year with a maximum capacity of 78 MW as an as-nominated profile (period 2) will be delivered to Gasunie’s electricity portfolio. The electricity shall be delivered to Gasunie from an existing/starting Dutch wind farm. With this purchase, the associated traceable GoO's are also acquired. For more information about the procedure, contract and how to receive the tender documents please see the uploaded document on Tender.
Deadline
De termijn voor de ontvangst van de offertes was 2023-08-15.
De aanbesteding werd gepubliceerd op 2023-06-20.
Aankondiging van een opdracht (2023-06-20) Object Toepassingsgebied van de aanbesteding
Titel: Elektriciteit
Referentienummer: WS3877870114
Korte beschrijving:
Gasunie intends to conclude a contract in which it wants to procure renewable energy produced by Dutch wind farms.
The scope of this contract is to establish the delivery of 25 MW as a baseload volume for the first period (1-x-2024 – 31-12-2024) for which the start month is flexible depending on when party can start the delivery of the requested volume. The total volume in period 1 depends on the start date of the contract, but always starting on the first of any given month in 2024. For the remaining 4 years (01-01-2025 till 31-12-2028), a volume of 250 GWh/year with a maximum capacity of 78 MW as an as-nominated profile (period 2) will be delivered to Gasunie’s electricity portfolio. The electricity shall be delivered to Gasunie from an existing/starting Dutch wind farm. With this purchase, the associated traceable GoO's are also acquired.
For more information about the procedure, contract and how to receive the tender documents please see the uploaded document on Tender.
Gasunie intends to conclude a contract in which it wants to procure renewable energy produced by Dutch wind farms.
The scope of this contract is to establish the delivery of 25 MW as a baseload volume for the first period (1-x-2024 – 31-12-2024) for which the start month is flexible depending on when party can start the delivery of the requested volume. The total volume in period 1 depends on the start date of the contract, but always starting on the first of any given month in 2024. For the remaining 4 years (01-01-2025 till 31-12-2028), a volume of 250 GWh/year with a maximum capacity of 78 MW as an as-nominated profile (period 2) will be delivered to Gasunie’s electricity portfolio. The electricity shall be delivered to Gasunie from an existing/starting Dutch wind farm. With this purchase, the associated traceable GoO's are also acquired.
For more information about the procedure, contract and how to receive the tender documents please see the uploaded document on Tender.
Aankondigingsmetadata
Originele taal: Engels 🗣️
Documenttype: Aankondiging van een opdracht
Aard van de opdracht: Leveringen
Regelgeving: Europese Unie, met GPA-deelname
Gemeenschappelijke woordenlijst overheidsopdrachten (CPV)
Code: Elektriciteit📦
Aanvullende CPV-code: Elektriciteit📦 Plaats van uitvoering
NUTS-regio: Nederland
🏙️
Procedure
Type procedure: Openbare procedure
Type bod: Inschrijving voor één perceel
Gunningscriteria
Laagste prijs
Object Toepassingsgebied van de aanbesteding
Korte beschrijving:
Gasunie intends to conclude a contract in which it wants to procure renewable energy produced by Dutch wind farms.
The scope of this contract is to establish the delivery of 25 MW as a baseload volume for the first period (1-x-2024 – 31-12-2024) for which the start month is flexible depending on when party can start the delivery of the requested volume. The total volume in period 1 depends on the start date of the contract, but always starting on the first of any given month in 2024. For the remaining 4 years (01-01-2025 till 31-12-2028), a volume of 250 GWh/year with a maximum capacity of 78 MW as an as-nominated profile (period 2) will be delivered to Gasunie’s electricity portfolio. The electricity shall be delivered to Gasunie from an existing/starting Dutch wind farm. With this purchase, the associated traceable GoO's are also acquired.
The scope of this contract is to establish the delivery of 25 MW as a baseload volume for the first period (1-x-2024 – 31-12-2024) for which the start month is flexible depending on when party can start the delivery of the requested volume. The total volume in period 1 depends on the start date of the contract, but always starting on the first of any given month in 2024. For the remaining 4 years (01-01-2025 till 31-12-2028), a volume of 250 GWh/year with a maximum capacity of 78 MW as an as-nominated profile (period 2) will be delivered to Gasunie’s electricity portfolio. The electricity shall be delivered to Gasunie from an existing/starting Dutch wind farm. With this purchase, the associated traceable GoO's are also acquired.
For more information about the procedure, contract and how to receive the tender documents please see the uploaded document on Tender.
Benaming van het perceel: Number of lots
Perceelnummer: 1
Korte beschrijving:
Period I : 01-xx-2024 / 31-12-2024, 25 MW Baseload
Period II: 01-01-2025 / 31-12-2028, 250 GW/Year with a maximum of 78 MW
Power: Hourly DA Epex Spot price (with a hedging possibility for the first period)
Fee: Transaction fee
GoO's: Fixed price for the GoO's
Beschrijving van de verlengingen:
Gasunie is intending to sign an EFET CPPA contract with the winning tenderer. This EFET CPPA agreement has an intended term of one broken year plus 4 years and can be extended, when mutually agreed, for a period of 1 year subject to the conditions of this tender.
Gasunie is intending to sign an EFET CPPA contract with the winning tenderer. This EFET CPPA agreement has an intended term of one broken year plus 4 years and can be extended, when mutually agreed, for a period of 1 year subject to the conditions of this tender.
Beschrijving van de opties: Possible extension of the intended CPPA
Juridische, economische, financiële en technische informatie Voorwaarden voor deelname
Technische en professionele bekwaamheid: - 1
Procedure
Rechtsgrondslag: 32014L0025
Tijdstip van ontvangst van inschrijvingen: 12:00
Talen waarin inschrijvingen of aanvragen tot deelneming kunnen worden ingediend: Engels 🗣️
Datum opening inschrijvingen: 2023-08-15 📅
Tijdstip van opening inschrijvingen: 12:00