The Contract involves the delivery of Precipitation gauges and third line maintenance on behalf of the Royal Netherlands Meteorological Institute (KNMI) as the Contracting Authority. The motivation behind this project is based on the need to replace the existing KNMI designed Precipitation gauges that have been used in KNMI’s automated network of Precipitation gauges since 1992. The scope of this European tender is to purchase a catchment style Precipitation gauge that adheres to WMO specifications for precipitation accumulation, intensity, and duration. If Supplier can not offer a catchment style gauge that can report duration with the required accuracy, then Supplier can include an additional precipitation monitor/detector in its offer to operate in parallel with the gauge. The expected order value of the purchase of the offered Solution is 50 gauges. The expected order value of the purchase of the offered Solution is 50* gauges x € 2.700 to € 6.000 per Solution = € 135.000 to € 300.000,-. The estimated value of 3rd line maintenance over the total technical life of the Solution is estimated to be about 20% of the purchase value: 20% from € 135.000 to € 300.000,- = € 27.000,- to € 60.000,-. Costs for training are estimated at € 15.000,-. The exact value depends on what the Tenderer offers. In addition to the cost of procurement, training and Third-line maintenance, costs for calibration-/ and maintenance sets and tools, spares and costs for additional products such as stand poles and windscreens will also be requested. Thus, the total value of the Agreement may be higher than just the sum of previously mentioned amounts depending on what appears necessary for installation of the offered Solution.
Deadline
De termijn voor de ontvangst van de offertes was 2024-08-14.
De aanbesteding werd gepubliceerd op 2024-06-19.
Aankondiging van een opdracht (2024-06-19) Object Toepassingsgebied van de aanbesteding
Titel: Precipitation gauges and 3rd line maintenance
Korte beschrijving:
“The Contract involves the delivery of Precipitation gauges and third line maintenance on behalf of the Royal Netherlands Meteorological Institute (KNMI) as...”
Korte beschrijving
The Contract involves the delivery of Precipitation gauges and third line maintenance on behalf of the Royal Netherlands Meteorological Institute (KNMI) as the Contracting Authority.
The motivation behind this project is based on the need to replace the existing KNMI designed Precipitation gauges that have been used in KNMI’s automated network of Precipitation gauges since 1992.
The scope of this European tender is to purchase a catchment style Precipitation gauge that adheres to WMO specifications for precipitation accumulation, intensity, and duration. If Supplier can not offer a catchment style gauge that can report duration with the required accuracy, then Supplier can include an additional precipitation monitor/detector in its offer to operate in parallel with the gauge.
The expected order value of the purchase of the offered Solution is 50 gauges. The expected order value of the purchase of the offered Solution is 50* gauges x € 2.700 to € 6.000 per Solution = € 135.000 to € 300.000,-.
The estimated value of 3rd line maintenance over the total technical life of the Solution is estimated to be about 20% of the purchase value: 20% from € 135.000 to € 300.000,- = € 27.000,- to € 60.000,-.
Costs for training are estimated at € 15.000,-.
The exact value depends on what the Tenderer offers.
In addition to the cost of procurement, training and Third-line maintenance, costs for calibration-/ and maintenance sets and tools, spares and costs for additional products such as stand poles and windscreens will also be requested. Thus, the total value of the Agreement may be higher than just the sum of previously mentioned amounts depending on what appears necessary for installation of the offered Solution.
Toon meer
Soort contract: Leveringen
Producten/diensten: Detectie- en analyseapparatuur📦 Informatie over kavels
Inschrijvingen kunnen worden ingediend voor een maximaal aantal partijen: 1
Beschrijving
Beschrijving van de aanbesteding:
“The Contract involves the delivery of Precipitation gauges and third line maintenance on behalf of the Royal Netherlands Meteorological Institute (KNMI) as...”
Beschrijving van de aanbesteding
The Contract involves the delivery of Precipitation gauges and third line maintenance on behalf of the Royal Netherlands Meteorological Institute (KNMI) as the Contracting Authority.
The motivation behind this project is based on the need to replace the existing KNMI designed Precipitation gauges that have been used in KNMI’s automated network of Precipitation gauges since 1992.
The scope of this European tender is to purchase a catchment style Precipitation gauge that adheres to WMO specifications for precipitation accumulation, intensity, and duration. If Supplier can not offer a catchment style gauge that can report duration with the required accuracy, then Supplier can include an additional precipitation monitor/detector in its offer to operate in parallel with the gauge.
The expected order value of the purchase of the offered Solution is 50 gauges. The expected order value of the purchase of the offered Solution is 50* gauges x € 2.700 to € 6.000 per Solution = € 135.000 to € 300.000,-.
The estimated value of 3rd line maintenance over the total technical life of the Solution is estimated to be about 20% of the purchase value: 20% from € 135.000 to € 300.000,- = € 27.000,- to € 60.000,-.
Costs for training are estimated at € 15.000,-.
The exact value depends on what the Tenderer offers.
In addition to the cost of procurement, training and Third-line maintenance, costs for calibration-/ and maintenance sets and tools, spares and costs for additional products such as stand poles and windscreens will also be requested. Thus, the total value of the Agreement may be higher than just the sum of previously mentioned amounts depending on what appears necessary for installation of the offered Solution.
Toon meer
Aanvullende producten/diensten: Detectie- en analyseapparatuur📦
Duur: 144 (MONTH)
Het onderstaande tijdschema is uitgedrukt in aantal maanden.
Informatie over opties
Opties ✅
Beschrijving van de opties:
“In addition to the cost of procurement, training and Third-line maintenance, costs for calibration-and maintenance sets and tools, spares and costs for...”
Beschrijving van de opties
In addition to the cost of procurement, training and Third-line maintenance, costs for calibration-and maintenance sets and tools, spares and costs for additional products such as stand poles and windscreens (depending on what appears necessary) will also be requested.
When receiving multiple offers Contracting Authority will also have to purchase two Solutions from the runner up in the context of the Waiting Room Agreement.
For more options see paragraph 1.1.3 and 1.1.5 of the Descriptive document.
Toon meer Gunningscriteria
Prijs ✅
Prijs (weging): 40
Kwaliteitscriterium (naam): Quality award criterion
Kwaliteitscriterium (weging): 60
Titel
Identificatienummer van de partij: LOT-0000
Procedure Soort procedure
Openbare procedure ✅ Administratieve informatie
Termijn voor de ontvangst van inschrijvingen of verzoeken tot deelneming: 2024-08-14 11:00:00 📅
Voorwaarden voor de opening van de offertes: 2024-08-14 11:00:00 📅
Talen waarin inschrijvingen of aanvragen tot deelneming kunnen worden ingediend: Engels 🗣️
Minimumtermijn gedurende welke de inschrijver de offerte gestand moet doen: 4
Juridische, economische, financiële en technische informatie Voorwaarden voor deelname
Lijst en korte beschrijving van aandoeningen:
“E1 Mandatory Grounds for Exclusion: See annex 5 ESPD of the Descriptive document and section 2.3 of the Descriptive document”
Lijst en korte beschrijving van aandoeningen:
“E2 Facultative Grounds for Exclusion: See annex 5 ESPD of the Descriptive document and section 2.4 of the Descriptive document.” Economische en financiële draagkracht
Lijst en korte beschrijving van de selectiecriteria:
“E3 Financial and Economic Capacity: The Tenderer must be able to demonstrate that it has the financial and economic standing to perform the Contract. To...”
Lijst en korte beschrijving van de selectiecriteria
E3 Financial and Economic Capacity: The Tenderer must be able to demonstrate that it has the financial and economic standing to perform the Contract. To determine this, the following applies:
If you are considered for award of the Contract/agreement, you will be required to submit an
Approved Annual Report/ Audit Certificate / assessment or
compilation report within 10 working days of a request to that effect, that does not include a ‘continuity section’ that expresses doubt concerning the viability of the organisation.
For companies that are not required to produce an annual statement of accounts, an assessment or compilation report will suffice.
Toon meer Technische en professionele bekwaamheid
Lijst en korte beschrijving van de selectiecriteria:
“E4 Professional Competence: You must be listed in the professional or commercial register and submit proof of registration within 10 working days when so...”
Lijst en korte beschrijving van de selectiecriteria
E4 Professional Competence: You must be listed in the professional or commercial register and submit proof of registration within 10 working days when so requested by the Contracting Authority.
Toon meer
Lijst en korte beschrijving van de selectiecriteria:
“E5 Technical and professional competence (references): Tenderer must demonstrate that they possess the following (core) competencies to be able to perform...”
Lijst en korte beschrijving van de selectiecriteria
E5 Technical and professional competence (references): Tenderer must demonstrate that they possess the following (core) competencies to be able to perform this Contract:
a. Tenderer has proven/demonstrable experience in providing 3rd line maintenance of at least ten (10) Precipitation gauges at organizations active on the Meteorological Market;
b. Tenderer has proven to have carried out one 4 year assignment as a reference project in a professional and correct manner in accordance with its client’s requirements, demonstrating its expertise and experience in providing and maintaining Precipitation gauges.
For more information see section 2.5.3 of the Descriptive Document.
Aanvullende informatie Dienst waar informatie over de beroepsprocedure kan worden verkregen
Naam: The Royal Netherlands Meteorological Institute represented by the Ministry of Infrastructure and Water Management
Nationaal registratienummer: 211946370
Postadres: Rijnstraat 8
Postcode: 2515 XP
Poststad: Den Haag
Regio: Agglomeratie ’s-Gravenhage🏙️
Land: Nederland 🇳🇱
E-mail: myrthe.leijdekkers@minienw.nl📧
Telefoon: +31 0686664547📞
URL: https://www.rijksoverheid.nl/ministeries/ministerie-van-infrastructuur-en-waterstaat🌏 Informatie over elektronische workflows
Elektronische facturering wordt aanvaard
Bron: OJS 2024/S 119-365578 (2024-06-19)
“The date for submitting questions for the second information memorandum has been incorporated into the schedule. You can submit questions until July 18,...”
The date for submitting questions for the second information memorandum has been incorporated into the schedule. You can submit questions until July 18, 2024 11'o clock a.m.
Toon meer
Bron: OJS 2024/S 133-411724 (2024-07-09)
Aankondiging van een opdracht (2024-08-02) Procedure Administratieve informatie
Termijn voor de ontvangst van inschrijvingen of verzoeken tot deelneming: 2024-09-11 11:00:00 📅
Voorwaarden voor de opening van de offertes: 2024-09-11 11:00:00 📅