SSM would like to understand the effects of CBBO: on subsidence, on stability and on integrity of the cavern. SSM would also like to learn more about what best practices might be: which is better for stability "fast and a lot" or “slow and few" releases? The study will be one of the building blocks that helps SSM to assess the risks of various cavern abandonment scenarios: like hard shut-in, CBBO, controlled high pressure or cavern filling. 300.000,- EURO
Deadline
De termijn voor de ontvangst van de offertes was 2024-03-04.
De aanbesteding werd gepubliceerd op 2024-01-09.
Aankondiging van een opdracht (2024-01-09) Object Toepassingsgebied van de aanbesteding
Titel: Influence of controlled brine bleed-off (CBBO) on cavern and cavern cluster stability
Reference number: 202310082
Korte beschrijving:
“SSM would like to understand the effects of CBBO: on subsidence, on stability and on integrity of the cavern. SSM would also like to learn more about what...”
Korte beschrijving
SSM would like to understand the effects of CBBO: on subsidence, on stability and on integrity of the cavern. SSM would also like to learn more about what best practices might be: which is better for stability "fast and a lot" or “slow and few" releases? The study will be one of the building blocks that helps SSM to assess the risks of various cavern abandonment scenarios: like hard shut-in, CBBO, controlled high pressure or cavern filling. 300.000,- EURO
Toon meer
Soort contract: services
Producten/diensten: Onderzoek en ontwikkeling, en aanverwante adviezen📦 Informatie over kavels
Voor alle partijen kunnen offertes worden ingediend ✅ Beschrijving
Beschrijving van de aanbesteding:
“SSM would like to understand the effects of CBBO: on subsidence, on stability and on integrity of the cavern. SSM would also like to learn more about what...”
Beschrijving van de aanbesteding
SSM would like to understand the effects of CBBO: on subsidence, on stability and on integrity of the cavern. SSM would also like to learn more about what best practices might be: which is better for stability "fast and a lot" or “slow and few" releases? The study will be one of the building blocks that helps SSM to assess the risks of various cavern abandonment scenarios: like hard shut-in, CBBO, controlled high pressure or cavern filling. 300.000,- EURO
Toon meer
Aanvullende producten/diensten: Advies inzake onderzoek📦
Hoofdlocatie of plaats van uitvoering:
“The Hague”
Duur: 24 (MONTH)
Het onderstaande tijdschema is uitgedrukt in aantal maanden.
Gunningscriteria
Kwaliteitscriterium (naam): Award criteria relating to Plan and approach
Kwaliteitscriterium (weging): 40
Kwaliteitscriterium (naam): Award criteria relating to the Quality of the project team
Kwaliteitscriterium (weging): 50
Prijs ✅
Prijs (weging): 10
Titel
Identificatienummer van de partij: LOT-0000
Procedure Soort procedure
Open procedure ✅ Administratieve informatie
Termijn voor de ontvangst van inschrijvingen of verzoeken tot deelneming: 2024-03-04 12:00:00 📅
Voorwaarden voor de opening van de offertes: 2024-03-04 12:01:00 📅
Talen waarin inschrijvingen of aanvragen tot deelneming kunnen worden ingediend: Nederlands 🗣️
Minimumtermijn gedurende welke de inschrijver de offerte gestand moet doen: 4
Juridische, economische, financiële en technische informatie Voorwaarden voor deelname
Lijst en korte beschrijving van regels en criteria:
“Requirements are defined in the tender documents”
Aanvullende informatie Dienst waar informatie over de beroepsprocedure kan worden verkregen
Naam: Ministerie van Economische Zaken en Klimaat
Nationaal registratienummer: 502035258
Postadres: Prinses Beatrixlaan 2
Postcode: 2595 AL
Poststad: Den Haag
Land: Nederland 🇳🇱
E-mail: iucezk@rvo.nl📧
Telefoon: +31 653104042📞
URL: https://www.rijksoverheid.nl/ministeries/ministerie-van-economische-zaken-en-klimaat🌏 Informatie over elektronische workflows
Elektronische facturering wordt aanvaard
Bron: OJS 2024/S 007-017250 (2024-01-09)