Environmental Impact Assessment Study Finland for company builder Volaghy

KIC Innoenergy SE

The scope is related to managing the complete EIA (Environmental Impact Assessment) process on behalf of the company builder VolagHy. VolagHy will establish several production facilities for the production of synthetic aviation fuel (eSAF). The project location is situated somewhere in Finland. On high-level, the first VolagHy site will have the following characteristics: •Intake o 200 – 250 kton/y captured CO2 from flue gases o 220 – 250 MW of electrical energy o 300 – 400 kton/y of water •Intermediates o130 – 150 kton/y methanol (Alternative 1) • Products o 40 – 60 kton/y Kerosene (eSAF) o 1 – 4 kton/y Naphtha (eNaphtha) o 1 – 2 kton/y diesel • Other emissions o Flue gas from flare and fired heaters o Treated wastewater •Storage facilities (capacity: tbd) for: o CO2 o Raw MeOH o MeOH, grade AA o eSAF o Naphtha o Diesel •Land o 10 – 20 ha with T/Kem zoning approved in Finland Deliverables (for one site) 1. EIA planning and permitting schedule (First step) o A detailed time plan for the EIA process from start to approval, including an assessment of key risks and necessary process steps. o A time plan incorporating all the other necessary permits and their timing from application to approval 2.EIA Programme and report (Second step) o Alternatives ▪ 1. The plant is not built ▪ 2. Production capacity of 50 kton/y ▪3. Production capacity of 100 kton/y o The work shall include the compiling of the EIA programme and the EIA report for the project and its alternatives as regulated in the Finnish Act on the Environmental Impact Assessment Procedure 252/2017 and the Decree of the Government on the environmental impact assessment procedure 277/2017. o Other ▪ The EIA shall include the necessary piping needed to integrate process streams between the CO2 source and our site. This distance is foreseen to be 0 – 3 km. ▪The EIA shall include the integration work from our plant to the existing district heating network. The point of interface shall be 0 – 3 km from our site. Options The following options shall be provided within the tender: 1.The complete process and deliverables (1. and 2. In Deliverables above) for a second site with the same characteristics 2.A site-specific Natura assessment (One site) 3.Air quality modelling (One site) 4.Noise modelling (One site) 5.Questionnaire to key stakeholders (Drafting, analyzing and summarizing the survey) (One site) 6.Interviews with key stakeholders (One site)

Deadline
De termijn voor de ontvangst van de offertes was 2025-01-15. De aanbesteding werd gepubliceerd op 2024-12-03.

Wie?

Wat?

Waar?

Aankoopgeschiedenis
Datum Document
2024-12-03 Aankondiging van een opdracht
Aankondiging van een opdracht (2024-12-03)
Object
Toepassingsgebied van de aanbesteding
Titel: Environmental Impact Assessment Study Finland for company builder Volaghy
Referentienummer: TBB 2025 accommodation sevices
Korte beschrijving:
“The scope is related to managing the complete EIA (Environmental Impact Assessment) process on behalf of the company builder VolagHy. VolagHy will establish...”    Toon meer
Soort contract: Diensten
Producten/diensten: Milieueffectbeoordelingsdiensten voor de bouw 📦
Beschrijving
Beschrijving van de aanbesteding:
“The scope is related to managing the complete EIA (Environmental Impact Assessment) process on behalf of the company builder VolagHy. VolagHy will establish...”    Toon meer
Aanvullende informatie:
“The procurement documents are available for unrestricted and full direct access, free of charge, at:...”    Toon meer
Hoofdlocatie of plaats van uitvoering:
“https://www.innoenergy.com/about/eit-innoenergy-team/work-with-us/accommodation-and-housing-services-for-the-business-booster-2025/”
Plaats van uitvoering: Noordoost-Noord-Brabant 🏙️
Duur
Startdatum: 2025-02-01 📅
Einddatum: 2026-02-01 📅
Titel
Identificatienummer van de partij: LOT-0001

Procedure
Soort procedure
Open procedure
Administratieve informatie
Termijn voor de ontvangst van inschrijvingen of verzoeken tot deelneming: 2025-01-15 23:59:59 📅
Talen waarin inschrijvingen of aanvragen tot deelneming kunnen worden ingediend: Engels 🗣️
Minimumtermijn gedurende welke de inschrijver de offerte gestand moet doen: 60
Informatie over een raamovereenkomst of een dynamisch aankoopsysteem
Raamovereenkomst met verschillende exploitanten

Aanbestedende dienst
Naam en adressen
Naam: KIC Innoenergy SE
Nationaal registratienummer: 51418886
Postadres: Kennispoort 6th floor · John F. Kennedylaan
Postcode: Eindhoven
Poststad: 5612AB
Regio: Zuidoost-Noord-Brabant 🏙️
Land: Nederland 🇳🇱
E-mail: christof.breda@innoenergy.com 📧
Telefoon: 031681412446 📞
URL: https://www.innoenergy.com/ 🌏
Adres van het kopersprofiel: https://www.innoenergy.com/about/eit-innoenergy-team/work-with-us/ 🌏
Type aanbestedende dienst
Publiekrechtelijke instelling
Hoofdactiviteit
Milieu
Communicatie
Documenten URL: https://www.innoenergy.com/about/eit-innoenergy-team/work-with-us/eia-study-for-finland-for-company-builder-volaghy/ 🌏
Deelname URL: https://www.innoenergy.com/about/eit-innoenergy-team/work-with-us/eia-study-for-finland-for-company-builder-volaghy/ 🌏

Aanvullende informatie
Herzieningsprocedure
Precieze informatie over de termijn(en) voor herzieningsprocedures:
“minimum 25 days for proposal submission and 10 days standstill”
Bron: OJS 2024/S 236-741275 (2024-12-03)