This project aims to demonstrate a breakthrough climate-change mitigation technology for the concrete industry by replacing cement with a low-carbon binder. The EU is subsidizing the first demonstration plant under the project name LIFE MIBA Filler.
The laboratory-scale research has resulted in a process flow diagram which we want to upscale in this MIBA Filler pilot plant (demo phase I) before having a full-scale demonstration plant (demo phase II). Hereto we invite companies to submit their quotations for amongst others following items.
Deadline
De termijn voor de ontvangst van de offertes was 2022-04-01.
De aanbesteding werd gepubliceerd op 2022-03-22.
Aankondiging van een opdracht (2022-03-22) Object Toepassingsgebied van de aanbesteding
Titel: Software voor industriële controle
Referentienummer: LIFE19/CCM/NL/001219 - E-I&A
Korte beschrijving:
“This project aims to demonstrate a breakthrough climate-change mitigation technology for the concrete industry by replacing cement with a low-carbon binder....”
Korte beschrijving
This project aims to demonstrate a breakthrough climate-change mitigation technology for the concrete industry by replacing cement with a low-carbon binder. The EU is subsidizing the first demonstration plant under the project name LIFE MIBA Filler.
Procedure
Type procedure: Openbare procedure
Type bod: Inschrijving voor alle percelen
Gunningscriteria
Uit economisch oogpunt voordeligste inschrijving
“After public tender announcement and receipt of quotations via TenderNed and/or via direct contact (e-mail), tender was awarded.”
Bron: OJS 2022/S 124-351391 (2022-06-23)