Korte beschrijving
1) Fabricate and deliver one retrievable packer and one surface controlled subsurface safety valve (SC-SSSV) suitable for hydrogen;
2) The adaptation of existing products and/or designs to make it suitable for hydrogen;
3) One or more tests to check the products if they are suitable for hydrogen and including the test in the borehole at Zuidwending;
4) The installation support with all relevant special installation equipment/tools;
5) The retrieval support after the tests;
6) Assessment/examination of elastomers and other materials;
7) tenderer delivers the following final reports of the results to Gasunie:
(a) workshop test reports,
(b) installation report,
(c) well test reports,
(d) assessment/examination report,
(e) any other relevant documents;
8) A report with the adjustments to the existing products to make them suitable for hydrogen.
Gasunie may use this data without restrictions for future purchases for packers and safety valves and is free to purchase this from other suppliers.