The law ‘Wind energy at Sea (Windenergie op Zee)’ of 1.7.2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network.
On 27.3.2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced ‘Roadmap windenergie op zee 2030’, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]:
Hollandse Kust (west) Beta- HKW beta — 0,7 GW.
Ten noorden van de Waddeneilanden — TNW 0,7 GW.
IJmuiden Ver Alpha — IJV alpha — 2 GW.
IJmuiden Ver Beta — IJV Beta — 2 GW.
[1] The Roadmap 2030 includes the wind area Hollandse Kust West alpha, but this is not part of this tender.
Deadline
De termijn voor de ontvangst van de offertes was 2019-10-16.
De aanbesteding werd gepubliceerd op 2019-09-16.
Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Object Toepassingsgebied van de aanbesteding
Titel: Offshore Grid NL — Offshore Route Survey activities (Non-UXO)
122309
Producten/diensten: Offshorediensten📦
Korte beschrijving:
“The law ‘Wind energy at Sea (Windenergie op Zee)’ of 1.7.2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO...”
Korte beschrijving
The law ‘Wind energy at Sea (Windenergie op Zee)’ of 1.7.2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network.
On 27.3.2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced ‘Roadmap windenergie op zee 2030’, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]:
Hollandse Kust (west) Beta- HKW beta — 0,7 GW.
Ten noorden van de Waddeneilanden — TNW 0,7 GW.
IJmuiden Ver Alpha — IJV alpha — 2 GW.
IJmuiden Ver Beta — IJV Beta — 2 GW.
[1] The Roadmap 2030 includes the wind area Hollandse Kust West alpha, but this is not part of this tender.
1️⃣
Aanvullende producten/diensten: Offshorediensten📦
Plaats van uitvoering: Nederland🏙️
Hoofdlocatie of plaats van uitvoering: Nl.
Beschrijving van de aanbesteding: Off-and nearshore route surveys.
Gunningscriteria
De prijs is niet het enige gunningscriterium en alle criteria worden alleen in de aanbestedingsdocumenten vermeld
Duur
Startdatum: 2020-04-01 📅
Einddatum: 2030-04-01 📅
Juridische, economische, financiële en technische informatie Economische en financiële draagkracht
Selectiecriteria zoals vermeld in de aanbestedingsdocumenten
Technische en professionele bekwaamheid
Selectiecriteria zoals vermeld in de aanbestedingsdocumenten
Procedure Soort procedure
Procedure van gunning via onderhandelingen met voorafgaande oproep tot mededinging
Administratieve informatie
Eerdere publicatie betreffende deze procedure: 2019/S 157-387888
Termijn voor de ontvangst van inschrijvingen of verzoeken tot deelneming: 2019-10-16 📅
Geschatte datum van verzending van de uitnodigingen tot inschrijving of tot deelneming aan de geselecteerde gegadigden: 2019-11-08 📅
Talen waarin inschrijvingen of aanvragen tot deelneming kunnen worden ingediend: Engels 🗣️
Het onderstaande tijdschema is uitgedrukt in aantal maanden.
Minimumtermijn gedurende welke de inschrijver de offerte gestand moet doen: 3
Aanvullende informatie Beoordelingsorgaan
Naam: Juridicial Court Arnhem
Postadres: Walburgstraat 2-4
Poststad: Arnhem
Postcode: 6811 CD
Land: Nederland 🇳🇱
Telefoon: +31 883612000📞
URL: www.rechtspraak.nl🌏 Herzieningsprocedure
Precieze informatie over de termijn(en) voor herzieningsprocedures:
“Candidate will be informed of the conditional selection decision at the earliest possible opportunity. If candidates object to the conditional selection...”
Precieze informatie over de termijn(en) voor herzieningsprocedures
Candidate will be informed of the conditional selection decision at the earliest possible opportunity. If candidates object to the conditional selection decision, they must make their objections known to TenneT within 20 (twenty) days of the day after the day the conditional selection decision has been sent via Negometrix by serving an application for interim measures before the competent preliminary injunctions court at Arnhem. If a candidate initiates legal proceedings in connection with the selection decision after these 20 days, TenneT will adopt the position that the candidate has inadmissible claims. This period must therefore be regarded as a time-limit.
Toon meer
Bron: OJS 2019/S 182-444485 (2019-09-16)
Award Aankondiging (2020-06-24) Aanbestedende dienst Naam en adressen
Naam: TenneT TSO B.V.
Nationaal registratienummer: 531969787
Contactpersoon: Will van der Worp
Telefoon: +31 889367349📞
E-mail: will.vander.worp@tennet.eu📧
Object Toepassingsgebied van de aanbesteding
Titel: Offshore Grid NL — Offshore Route Survey Activities (Non-UXO)
122309
Korte beschrijving:
“The law ‘Wind energy at Sea (Windenergie op Zee)’ of 1 July 2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT...”
Korte beschrijving
The law ‘Wind energy at Sea (Windenergie op Zee)’ of 1 July 2015, intends to scale up wind energy in the Dutch sector of the North Sea. In this law TenneT TSO B.V. (hereafter Client) is the offshore grid operator. In this role the Client is responsible for engineering, procurement, installation, construction and operation of the connections between the offshore wind farms (through a converter platform) to the onshore network.
On 27 March 2018 the Dutch Ministry of Economic Affairs and Climate Policy introduced ‘Roadmap windenergie Op zee 2030’, hereafter Roadmap 2030. The Roadmap 2030 designates the following areas for wind energy in the Dutch North Sea[1]:
Hollandse Kust (west) Beta — HKW beta — 0.7 GW
Ten noorden van de Waddeneilanden — TNW — 0.7 GW
IJmuiden Ver Alpha — IJV alpha — 2 GW
IJmuiden Ver Beta — IJV Beta — 2 GW
[1] The Roadmap 2030 includes the wind area Hollandse Kust West alpha, but this is not part of this tender.
Toon meer Beschrijving
Hoofdlocatie of plaats van uitvoering: Nl
Aanvullende informatie
Procedure Informatie over de kaderovereenkomst
De aanbesteding omvat de vaststelling van een raamovereenkomst
Administratieve informatie
Eerdere publicatie betreffende deze procedure: 2019/S 182-444485
Informatie over de beëindiging van de oproep tot mededinging in de vorm van een vooraankondiging
De aanbestedende dienst zal geen verdere opdrachten gunnen op basis van deze vooraankondiging
Gunning van het contract
1️⃣
Titel: Agreement Offshore Route Surveys for HKW, TNW and IJmuiden-Ver (a) en (b)
Datum van sluiting van het contract: 2020-03-09 📅
Informatie over aanbestedingen
Aantal ontvangen offertes: 4
Naam en adres van de contractant
Naam: Next Geosolutions Éurope SpA
Postadres: Via Santa Brigida 39
Poststad: Napoli
Postcode: 80133
Land: Nederland 🇳🇱
E-mail: nextgeosolutions@pec.it📧
Regio: Nederland🏙️
De aannemer is een KMO
2️⃣
Titel:
“Backup Agreement Offshore Route Surveys for HKW, TNW and IJmuiden-Ver (a) en (b)” Naam en adres van de contractant
Naam: Fugro Netherlands Marine B.V.
Poststad: Nootdorp
Aanvullende informatie Aanvullende informatie
“Next Geosolutions Éurope SpA has their registered office in Italy (IT).
As stated in the tender documents Tennet TSO B.V. has also awarded a back-up...”
Next Geosolutions Éurope SpA has their registered office in Italy (IT).
As stated in the tender documents Tennet TSO B.V. has also awarded a back-up agreement. The back-up agreement has been awarded to: Fugro Netherlands Marine B.V. / Nootdorp / The Netherlands.
Toon meer Beoordelingsorgaan
Naam: Court of Arnhem
Bron: OJS 2020/S 122-300272 (2020-06-24)