Beschrijving van de aanbesteding
The first development phase, DP1, includes fundamental experiments and design, and testing and production of a prototype of the crushing tool by the contractor. Based on results in DP1, in the second phase DP2, three definitive models must be developed and delivered for the purpose of radionuclide production. For these production types as well as the prototype, design and drawings must be delivered.