Supply, Delivery and Commissioning of a Solar Power Plant in Diaramana Village, Mali
This contract requires a 75 kWp solar photovoltaic (PV) power plant to be purchased, delivered, installed, tested and integrated with a generator (to be supplied by others) that will be interconnected into a mini-grid in Diaramana village, Mali. The project will connect 300 households, businesses and community centres. See the technical specifications in the complete tender dossier for further information.
Period of execution:
30 days after signature of the contract for the first batch (of 2).
90 days after signature of the contract for the second batch.
ACP-EC Partnership Agreement signed at Cotonou on 23.6.2000 as amended on 25.6.2005 and on 22.6.2010 (Annex IV).
Deadline
De termijn voor de ontvangst van de offertes was 2018-03-07.
De aanbesteding werd gepubliceerd op 2018-01-30.
Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?
Wat?
Waar?
Aankoopgeschiedenis
Datum |
Document |
2018-01-30
|
Aankondiging van een opdracht
|
2018-06-26
|
Award Aankondiging
|