PC-7 100-hours, 200-hours, 1000-hours Phase Inspection on site / RNLAF / 2017-2021
The RNLAF has a requirement for 40 phase inspections (including options), these inspections will be divided over the years 2017-2021.
A distinction has been made in the following sorts of inspection:
1. 100 (one hundred) hours phase inspection;
2. 200 (two hundred) hours phase inspection;
3. 1000 (one thousand) hours phase inspection.
All inspections can be extended with corrective maintenance as a result of the performed phase inspection.
Deadline
De termijn voor de ontvangst van de offertes was 2017-02-14.
De aanbesteding werd gepubliceerd op 2017-01-09.
Wie?
Wat?
Aankoopgeschiedenis
Datum |
Document |
2017-01-09
|
Aankondiging van een opdracht
|
2017-04-06
|
Aanvullende inlichtingen
|