Geotechnical soil investigations for offshore Wind Farm Zone Hollandse Kust (noord)
Carrying out the geotechnical investigations required to obtain the soil information at the offshore Wind Farm Zone Hollandse Kust (noord). This soil information will be made available to the participants in the concession tenders for this offshore wind farm zone.
The geotechnical soil investigations of Wind Farm Sites I & II of the Wind Farm Zone Hollandse Kust (zuid) will be the reference for the Scope of Work, see
http://offshorewind.rvo.nl/generalzh
The tender is divided in 2 lots:
Lot nº 1 (25-35 % of total value): Executing seabed PCPTs campaign with a target depth of 50-60m.
Lot nº 2 (65-75 % of total value): Executing continuous sampling PCPT boreholes (with a target depth of 50 - 80m) and seismic PCPT boreholes (with a target depth of 50-60m); vibrocoring; MIC testing; a laboratory testing programme (cyclic and static) on the obtained soil samples and creating a detailed geological ground model.
Deadline
De termijn voor de ontvangst van de offertes was 2018-02-01.
De aanbesteding werd gepubliceerd op 2017-12-20.
Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?
Wat?
Waar?
Aankoopgeschiedenis
Datum |
Document |
2017-12-20
|
Aankondiging van een opdracht
|
2018-05-15
|
Award Aankondiging
|