The aim of this tender is to conclude framework contracts with external experts who can support RVO.nl in managing site studies. These site studies will be used for the preparation of bids for tenders to construct a wind farm according to the Offshore Wind Energy Act (Wet Windenergie op zee) and SDE+. The work includes (but is not limited to): โ Preparation Scopes of Work for studies to be contracted by RVO.nl, โ Evaluation of proposals from tenderers, โ Contract management, โ Review of deliverables. The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as...
Deadline
De termijn voor de ontvangst van de offertes was 2017-04-12.
De aanbesteding werd gepubliceerd op 2017-03-02.
Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Aankondiging van een opdracht (2017-03-02) Object Toepassingsgebied van de aanbesteding
Titel: Advies inzake onderzoek
Referentienummer: WOZ2160019
Korte beschrijving:
The aim of this tender is to conclude framework contracts with external experts who can support RVO.nl in managing site studies. These site studies will be used for the preparation of bids for tenders to construct a wind farm according to the Offshore Wind Energy Act (Wet Windenergie op zee) and SDE+.
The work includes (but is not limited to):
โ Preparation Scopes of Work for studies to be contracted by RVO.nl,
โ Evaluation of proposals from tenderers,
โ Contract management,
โ Review of deliverables.
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as...
The aim of this tender is to conclude framework contracts with external experts who can support RVO.nl in managing site studies. These site studies will be used for the preparation of bids for tenders to construct a wind farm according to the Offshore Wind Energy Act (Wet Windenergie op zee) and SDE+.
The work includes (but is not limited to):
โ Preparation Scopes of Work for studies to be contracted by RVO.nl,
โ Evaluation of proposals from tenderers,
โ Contract management,
โ Review of deliverables.
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as...
Aankondigingsmetadata
Originele taal: Engels ๐ฃ๏ธ
Documenttype: Aankondiging van een opdracht
Aard van de opdracht: Diensten
Regelgeving: Europese Unie
Gemeenschappelijke woordenlijst overheidsopdrachten (CPV)
Code: Advies inzake onderzoek๐ฆ
Aanvullende CPV-code: Advies inzake onderzoek๐ฆ Plaats van uitvoering
NUTS-regio: Nederland
๐๏ธ
Procedure
Type procedure: Openbare procedure
Type bod: Inschrijving voor alle percelen
Gunningscriteria
Uit economisch oogpunt voordeligste inschrijving
Object Toepassingsgebied van de aanbesteding
Korte beschrijving:
The aim of this tender is to conclude framework contracts with external experts who can support RVO.nl in managing site studies. These site studies will be used for the preparation of bids for tenders to construct a wind farm according to the Offshore Wind Energy Act (Wet Windenergie op zee) and SDE+.
The aim of this tender is to conclude framework contracts with external experts who can support RVO.nl in managing site studies. These site studies will be used for the preparation of bids for tenders to construct a wind farm according to the Offshore Wind Energy Act (Wet Windenergie op zee) and SDE+.
The work includes (but is not limited to):
โ Preparation Scopes of Work for studies to be contracted by RVO.nl,
โ Evaluation of proposals from tenderers,
โ Contract management,
โ Review of deliverables.
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as...
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as...
Maximum aantal percelen per inschrijver: 4
Benaming van het perceel: Providing expert support: Obstructions and mapping
Perceelnummer: 1
Korte beschrijving:
In 2017 the site investigations for Wind Farm Zone Hollandse Kust (noord) are planned. The expected volume of expert support in 2017 is:
Lot 1: Obstructions and mapping: 500 hours;
Lot 2: Soil (possible partly in 2018): 1 000 hours;
Lot 3: Wind and water: 500 hours;
Lot 4: Interfaces with other activities: 500 hours.
The volume of the work in 2018 is expected to be:
Lot 2: Soil: 2 000 hours;
However, this is only an indication from which no rights can be derived. A prognosis on the volume of expert support in 2019 and 2020 cannot be given at this moment.
Duur: 24 maanden
Beschrijving van de verlengingen:
For each lot the Contracting Authority intends to conclude a Framework Agreement with three contractors with a term of 2 years, with an option to renew twice for 1 year.
Beschrijving van de opties:
For each lot the Contracting Authority intends to conclude a Framework Agreement with three contractors with a term of 2 years, with an option to renew twice for 1 year.
Benaming van het perceel: Providing expert support: Soil
Perceelnummer: 2
Benaming van het perceel: Providing expert support: Wind and Water
Perceelnummer: 3
Benaming van het perceel: Interfaces with other activities
Perceelnummer: 4
Gemeenschappelijke woordenlijst overheidsopdrachten (CPV)
Aanvullende CPV-code: IA21
KA16
Plaats van uitvoering
Hoofdlocatie of plaats van uitvoering: The Netherlands
Procedure
Aantal te overwegen deelnemers: 12
Tijdstip van ontvangst van inschrijvingen: 14:00
Talen waarin inschrijvingen of aanvragen tot deelneming kunnen worden ingediend: Engels ๐ฃ๏ธ
Geldigheidsduur van de inschrijving: 4 maanden
Datum opening inschrijvingen: 2017-04-12 ๐
Tijdstip van opening inschrijvingen: 14:15
Gunningscriteria
Kwaliteitscriterium (naam): Quality and availability of experts
Kwaliteitscriterium (weging): 70
Weging van de prijs: 30
Award Aankondiging (2017-06-13) Object Toepassingsgebied van de aanbesteding
Korte beschrijving:
The aim of this tender is to conclude framework contracts with external experts who can support RVO.nl in managing site studies. These site studies will be used for the preparation of bids for tenders to construct a wind farm according to the Offshore Wind Energy Act (Wet Windenergie op zee) and SDE+.
The work includes (but is not limited to):
โ Preparation Scopes of Work for studies to be contracted by RVO.nl,
โ Evaluation of proposals from tenderers,
โ Contract management,
โ Review of deliverables.
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as.
The aim of this tender is to conclude framework contracts with external experts who can support RVO.nl in managing site studies. These site studies will be used for the preparation of bids for tenders to construct a wind farm according to the Offshore Wind Energy Act (Wet Windenergie op zee) and SDE+.
The work includes (but is not limited to):
โ Preparation Scopes of Work for studies to be contracted by RVO.nl,
โ Evaluation of proposals from tenderers,
โ Contract management,
โ Review of deliverables.
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as.
Totale waarde van de aanbesteding: 2000000.0 EUR ๐ฐ
Aankondigingsmetadata
Documenttype: Award Aankondiging
Procedure
Type bod: Niet van toepassing
Aanbestedende dienst Identiteit
Poststad: The Hague
Object Toepassingsgebied van de aanbesteding
Korte beschrijving:
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as.
The site studies cover a broad range of knowledge sectors. Therefore this tender is divided into lots. Tenderers are requested to offer experts for one or multiple lots. In the Netherlands the Government sets the first steps in the development of offshore wind farms. The Government first designates a Wind Farm Zone. It then carries out the site investigations, determines the conditions for building and operating a wind farm, and issues request for tenders from industry for the as.
Nog te bepalen.
Plaats van uitvoering
Hoofdlocatie of plaats van uitvoering: NL.
Gunning van het contract
Datum van sluiting van de overeenkomst: 2017-06-01 ๐
Bron: OJS 2017/S 112-226051 (2017-06-13)