Turn key delivery of Manipulators for the High Activity (HA) Cells

Nuclear Research and Consultancy Group

NRG is about to replace the Manipulators which are used to handle the radioactive material like human beings. The current Manipulators are amortized and have to be replaced. The Tenderer has to supply these Manipulators. The scope of this work includes the turn key delivery, of 14 (fourteen) new Manipulators (including spare parts) for cells A to E of the hot cell labs. This includes the design, engineering, manufacture, assembly, inspection, delivery, installation (implementation — including hoisting and transportation on site when necessary), design/fabrication/installation/mounting of booting, commissioning and testing and optional maintenance.

Deadline
De termijn voor de ontvangst van de offertes was 2016-08-29. De aanbesteding werd gepubliceerd op 2016-07-15.

Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?

Wat?

Waar?

Aankoopgeschiedenis
Datum Document
2016-07-15 Aankondiging van een opdracht
2017-03-13 Award Aankondiging