Supply, installation and maintenance of a 75 kW/150 kWh battery storage system for grid-connected and island operation at the JRC-IET

European Commission, Joint Research Centre, Institute for Energy and Transport

Increased penetration of renewable energy sources in electricity networks results in growing power production variability. Hence reliable balancing technologies are required a) to provide extra power when RES power production is too low; and b) to store energy when there is a surplus of produced RES power. This balancing task can be provided by energy storage technologies, not only in transmission and distribution grids but also in smaller-scale networks. The requested battery storage system must allow carrying out a variety of experiments in this field.

Deadline
De termijn voor de ontvangst van de offertes was 2014-10-29. De aanbesteding werd gepubliceerd op 2014-09-12.

Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?

Wat?

Aankoopgeschiedenis
Datum Document
2014-09-12 Aankondiging van een opdracht
2015-04-15 Award Aankondiging