Supply, installation and maintenance of a 50 kW/150 kWh battery storage system for grid-connected and island operation at the JRC-IET
Increased penetration of renewable energy sources in electricity networks results in growing power production variability. Hence reliable balancing technologies are required a) to provide extra power when RES power production is too low and b) to store energy when there is a surplus of produced RES power. This balancing task can be provided by energy storage technologies, not only in transmission and distribution grids but also in smaller-scale networks. The requested battery storage system must allow for carrying out a variety of experiments in this field.
Deadline
De termijn voor de ontvangst van de offertes was 2014-08-12.
De aanbesteding werd gepubliceerd op 2014-06-06.