The RNLAF has the intention to contract out Test, Teardown and Evaluation (TT&E) and/or repair of airframe and engine parts for the PC-7 aircraft fleet.
The period of this contract will be from 1.1.2015 until 31.12.2017 with 2 options for each 1 year contract extension.
Deadline
De termijn voor de ontvangst van de offertes was 2014-06-16.
De aanbesteding werd gepubliceerd op 2014-05-16.