LTE-VN24&25: Renewal Fire detection and evacuation alarm system VN24&25
Nuon location Velsen consists of two power plants, Velsen 24 and Velsen 25. Both units have an output of approximately 360MW(e). Unit VN24 is built in 1973 and Unit VN25 is built in 1986. The units are planned to run until 2026 with unit VN25 in base load and unit VN24 in spare activities. Therefore we are currently running the Life Time Extension program “Easter”.
The building's sizes are approximately: Boiler house 40x35x65m, Turbine hall 75x50x27m and Technical building 15x12x20m.
Deadline
De termijn voor de ontvangst van de offertes was 2014-07-29.
De aanbesteding werd gepubliceerd op 2014-07-02.