CNG (Semi) Trailers
By this European tender Gasunie is searching for a supplier for 3 CNG (semi) trailer. The CNG Semi trailers will operate within the environment of the Gasunie Network and should comply to requirements to be stated in the Request for Proposal. In order to determine whether the products of the applicant will meet the basic (functional) requirements, some functional requirements are stated below:
The CNG Semi Trailers shall consist functions such as:
โ Suitable for storing high-pressure natural gas;
โ All the equipment on the wagon shall comply with statutory regulations;
โ The connections shall be suitable for loading and unloading;
โ Shall comply with the transport conditions and regulations according to Dutch and EU regulations. This shall include inter alia A.D.R. regulations, for both loaded and empty vehicles. (In case of contradictions the Dutch regulations will prevail).
Deadline
De termijn voor de ontvangst van de offertes was 2014-04-25.
De aanbesteding werd gepubliceerd op 2014-03-26.
Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?
Wat?
Waar?
Aankoopgeschiedenis
Datum |
Document |
2014-03-26
|
Aankondiging van een opdracht
|
2015-06-10
|
Award Aankondiging
|