Wind Turbine Generator Package
Vattenfall intents to participate in the call for bids for the concession of offshore wind farm Horns Rev 3 concession, led by the DEA [Danish Energy Agency]. This wind farm will have a capacity of maximum 400 MW and will consist of foundations, wind turbine generators and inter array cables.
The total scope of works of this tender includes the design, engineering, manufacturing, fabrication, supply, installation, commissioning and operation and maintenance of the offshore wind turbine generators for the offshore wind project Horns Rev 3.
Deadline
De termijn voor de ontvangst van de offertes was 2013-12-24.
De aanbesteding werd gepubliceerd op 2013-11-28.
Wie?
Wat?
Waar?
Aankoopgeschiedenis
Datum |
Document |
2013-11-28
|
Aankondiging van een opdracht
|
2016-02-02
|
Award Aankondiging
|