Tender for 9 power transformers
Delivery of 9 Power Transformers
Order includes the following:
— For the engineering, manufacture, assembly, testing and operational delivery of the power transformers — The transport and placement* of the Power transformers
—The assembly and operational delivery** of the Power transformers to the delivery location _The maintenance and Services (incl. troubleshooting) and Repair of a Power transformer within the guarantee period of a delivery.
Deadline
De termijn voor de ontvangst van de offertes was 2013-09-27.
De aanbesteding werd gepubliceerd op 2013-08-12.
Wie?
Wat?
Waar?
Aankoopgeschiedenis
Datum |
Document |
2013-08-12
|
Aankondiging van een opdracht
|