A Frame-mounted fuel gas plant will be provided and will be installed in a separate room within the compressor station.
In principal Gasunie will take gas from the mainline (approx. pressure 70 bar) which Gasunie want to use for the gas turbines on the compressor station. For the gas turbines Gasunie needs a gas pressure of approx. 20 bar and a temperature of 20 degrees Celsius. So Gasunie hash to reduce the pressure, needs to heat up the gas, measure the amount of gas and because the equipment in this plant is sensitive Gasunie needs to filter the gas.
The total amount of fuel gas is less than 10.000nm3/hr.
Gasunie want to heat up the fuel gas with a hot water glycol system. The hot water\glycol will be heated up by some small boilers. The fuel gas reduction, measuring, filtering and heating up is also a part of the fuel gas plant.
The scope of this European tender is:
โ€” Engineering, fabrication and the delivery of the fuel gas package as describbed above,
โ€” The fuel gas plant needs to be in accordance whit DVGW G491, DVGW G492,
โ€” The pressure vessels needs to be in accordance which AD 2000 and PED requirements.

Deadline
De termijn voor de ontvangst van de offertes was 2013-04-04. De aanbesteding werd gepubliceerd op 2013-03-04.

Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?

Wat?

Waar?
  • โ€ข Deutschland

Aankoopgeschiedenis
Datum Document
2013-03-04 Aankondiging van een opdracht
2014-01-07 Award Aankondiging