IOS DE 2013 filter separators

N.V. Nederlandse Gasunie

General
This specification will be ready in the next phase of this European tender: the request for proposal phase.
The optional requirements for Wardenburg and Rysum will be decided in the course of 2013.
Filter separators
For protection of the compressors at Quarnstedt and metering devices of station Ellund, horizontal gas/liquid filter separators will be installed. According to operator's experience the incoming process gas contains small contents of solids/liquids (<100 l/day). The condensate mainly consists of water saturated glycols, additives from gas production, and small amounts of higher HC condensates.
The intended configuration per project is 2 filter separators with 100 % capacity, though during normal operation all filter separators are on stream. The turndown capability of the filter separators shall be 0 to 100%. The horizontal filter separator shall be a two stage filter. The first stage with a filter/coalescer element and the second stage with a vane package and beneath the separator vessel a โ€“ two chamber - condensate collection vessel with a minimum diameter of DN400.
Scope:
- The horizontal filter separator shall be a two stage filter. The first stage with a filter/coalescer elements and the second stage with a stainless steel vane package and beneath the separator vessel a โ€“ two chamber - condensate collection vessel with a minimum diameter of DN400.
Proven design, state of the art filter sections shall be provided.
- A two chamber liquid collection vessel beneath the main filter separator vessel, integrated into vessel skirts. Both vessel ends equipped with flanged connection and blind flange with davit.
- Quick opening closure with davit for removal of filter lorry. Quick opening closure shall be equipped with pressure safety device and vent pipe.
- Typical appurtenances like lifting lugs, earthing bosses, on the condensate collection vessel optionally insulation clips (for min 100mm insulation), supports, etc.
- Corrosion protection. In-outside: coating according Gasunie standard to be specified in RFQ.
- Design in accordance with AD 2000.
- All welding activities have to follow AD2000 HP.
- All requireed inspections, non destructive testings, certifications, and documentation.
- Delivery DDP construction site.

Deadline
De termijn voor de ontvangst van de offertes was 2013-03-21. De aanbesteding werd gepubliceerd op 2013-02-18.

Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?

Wat?

Waar?
  • โ€ข Deutschland

Aankoopgeschiedenis
Datum Document
2013-02-18 Aankondiging van een opdracht
2014-01-07 Award Aankondiging