Supply of components for 1000 Solar Home Systems - ACP countries — Guinea Bissau
The supply of components for in total 1 000 Solar Home Systems (SHS) to be delivered in 2 batches maximum in order to make energy accessible for rural householders in the region of Gabu, Guinea-Bissau.
Capacity level of the solar panels to be supplied: 75 Wp (See technical specifications in the complete tender).
The delivery must take place in Gabu in Guinea-Bissau.
Tenderers (including firms within the same legal group, other members of the same consortium, and sub-contractors) may submit one tender for all batches. Any tenderer may state in its tender that it would offer a discount in the event that its tender is accepted.
Deadline
De termijn voor de ontvangst van de offertes was 2013-02-05.
De aanbesteding werd gepubliceerd op 2012-12-24.
Wie?
Wat?
Waar?
Aankoopgeschiedenis
Datum |
Document |
2012-12-24
|
Aankondiging van een opdracht
|