Station Control System (Main Process Control System) of Gas Compressor Station Embsen (Germany) and Gas Compressor Station Quarnstedt (Germany) (EA-2012.27/PM)

N.V. Nederlandse Gasunie

The scope encompasses the complete design and engineering, drawing package, assembly of cabinets, on-site delivery, testing (FAT), on-site commissioning including SAT and the start-up of the Station Control System including all necessary process and scada hardware and software and including (as-built) drawing package and documentation.
For many years Gasunie Deutschland is standardized on ABB AC800F and Freelance voor process control systems and scada systems and standardized on HIMA for the ESD systems. For that reason the use of these systems is obliged and will be prescribed in the detailed specification as part of the Request for Proposal (RFP) in Phase 2 of the tender. Alternative solution shall not be assessed and evaluated.
Applicant shall demonstrate that he has extensive experience with the design, engineering, assembly etc. of complex Process Control Systems and in particular with Process Control Systems for gas compressor stations implemented with the ABB AC800F and Freelance system family and the HIMA ESD system family.
The SCS shall be delivered conform the Gasunie specifications and standards as shall be presented as part of the RfP.

Deadline
De termijn voor de ontvangst van de offertes was 2012-12-03. De aanbesteding werd gepubliceerd op 2012-10-30.

Wie?

Wat?

Waar?
  • • Deutschland › Niedersachsen
  • • Deutschland › Schleswig-Holstein

Aankoopgeschiedenis
Datum Document
2012-10-30 Aankondiging van een opdracht
2013-08-20 Award Aankondiging