Remedial burial activities NorNed HVDC cable in Eems/Waddenzee area

TenneT TSO B.V.

Remedial burial activities to increase the protection of the NorNed HVDC cable in the Eems and Waddenzee along the cable route from KP 0.0 to KP 40.0. Target burial depth is 2 meters and at certain areas 3 meters. Preference is that activities are executed while HVDC cable connection is in operation at + 450 kV DC and - 450 kV DC.
The NorNed HVDC cable, constructed in the period from 2006 to 2008, consists of a two core HVDC connection between the Netherlands and Norway. The area between KP 0.0 (the starting point at the dike at Eemshaven) and KP 40.0, is due to its exposure to strong tidal currents and unstable seabed soils an area of concern.

Deadline
De termijn voor de ontvangst van de offertes was 2012-04-26. De aanbesteding werd gepubliceerd op 2012-04-05.

Leveranciers
De volgende leveranciers worden genoemd in gunningsbesluiten of andere aanbestedingsdocumenten:
Wie?

Wat?

Waar?

Aankoopgeschiedenis
Datum Document
2012-04-05 Aankondiging van een opdracht
2012-09-03 Award Aankondiging