Powercable connection monitoring system

TenneT TSO B.V.

Powercable connection monitoring system for 380kV high voltage cable. Several 380 kV XLPE cable projects have been realized in Europe, the operation experiences of this kind of cable in meshed networks are however very limited in general. Operation time is relatively short and behaviour of this kind of cables in 380 kV transmission systems is not clear.
TenneT has asked to proof the theoretical models on system level using off-line or on-line measurements. To be able to measure a monitoring/measuring system is needed. It comprises a central unit, sensor connections, a database, storage and transport of measuring data, maintenance and implementation.
TenneT aims to use this system firts in the Randstad 380kV Southring and in future there is a possibility that a similar system will be used in Randstad 380kV Northring.

Deadline
De termijn voor de ontvangst van de offertes was 2012-06-18. De aanbesteding werd gepubliceerd op 2012-06-01.

Wie?

Wat?

Waar?

Aankoopgeschiedenis
Datum Document
2012-06-01 Aankondiging van een opdracht