OYSTER Reactor Modification Project
Modification research reactor in two respects and objectives:
1) The operational power is to be increased from 2 to 3 MW or more without core compaction. The design and modification of the research reactor core itself, as well as the cooling system;
and
2) A cold-neutron source is to be installed. The near-core part to be designed and built.
Deadline
De termijn voor de ontvangst van de offertes was 2013-01-22.
De aanbesteding werd gepubliceerd op 2012-12-21.
Wie?
Wat?
Waar?
Aankoopgeschiedenis
Datum |
Document |
2012-12-21
|
Aankondiging van een opdracht
|
2013-01-18
|
Aanvullende inlichtingen
|