Hoeveelheid of omvang
Lot 1: encompasses the construction of a Heat Grid. The contractor is responsible for (not limited):โ Review engineering package,โ Develop a detailed engineering package HDD based on NEN3650/NEN3651,โ Develop a planning all required activities integrated which fit the NUON milestones,โ Develop a plan for traffic control and a plan for all required Ecological provisions,โ Construction (including welding) of the pipeline, realise the required drillings and dam passings โ based on NEN3650/NEN3651 โ and secure the pipeline to an existing bridge construction based on engineering package and contract,โ Supply of non pipeline related materials for bridge construction purposes,โ Acquire all required works related permits e.g. for installing temporary work premises or for temporary road access/exit,โ Finalizing the works as built.Lot 2: encompasses the supply of pipeline materials for the purpose of a heat grid of approx. 5km routing. The pipeline material have to be Steel-PUR-PE, based on NEN-EN 13941 pipeline class C and standard EHP/001. Supplier shall also supply all several applicable components like bends, T-pieces, welding joints, etc.Managing and maintenance of the pipeline, after commissioning and when the warranty period ends, will not be part of the works.