Biomass Scale Up Buggenum

NUON Power Buggenum B.V.

The Willem Alexander Centrale (WAC) is a coal gasification power plant, located in the southern part of the Netherlands. The power plant has a capacity of approximately 240MWe, is commissioned in 1993.
To reduce CO2 emissions, the possibility of co-gasification of biomass in the WAC is being studied. The strategy of Nuon aims to co-gasify 70 % (energy basis) biomass at the WAC. In order to reach this goal, Hardware.
Modifications (HMs) to the exisiting facility are required.For more general information on the facilities in Buggenum and NUON in general,we refer to www.nuon.com.

Deadline
De termijn voor de ontvangst van de offertes was 2012-08-15. De aanbesteding werd gepubliceerd op 2012-06-29.

Wie?

Wat?

Waar?

Aankoopgeschiedenis
Datum Document
2012-06-29 Aankondiging van een opdracht