The replacement of air-cooled water chillers and retrofitting of cooling system in building 312 of the JRC-IET

European Commission, Joint Research Centre, Institute for Energy and Transport

The Institute for Energy and Transport (IET) intends to replace the existing old air-cooled water chillers of building 312 and a retrofitting of the cooling system, in accordance with the technical specifications which are part of the tendering documentation.

Deadline
De termijn voor de ontvangst van de offertes was 2011-10-28. De aanbesteding werd gepubliceerd op 2011-09-09.

Wie?

Wat?

Aankoopgeschiedenis
Datum Document
2011-09-09 Aankondiging van een opdracht
2011-09-29 Aanvullende inlichtingen
2012-02-08 Aanvullende inlichtingen