Air cooled heat exchanger
The expansion of the Gasunie Deutschland gas transport system requires both an increase in throughput capacity of existing gas pipelines (for example by means pipe loops) and the construction of gas compressor stations or their expansion.
For the post-cooling of the compressed gas at the common gas output line, 2 x 50 % air-cooled process gas coolers are to be built. The arrangement in the common pressure line requires a high part-load performance of the cooler group. Temperature is regulated by the rotation speed of the individual fans.
Deadline
De termijn voor de ontvangst van de offertes was 2011-04-29.
De aanbesteding werd gepubliceerd op 2011-04-05.
Wie?
Wat?
Waar?
-
•
Deutschland
› Schleswig-Holstein
Aankoopgeschiedenis
Datum |
Document |
2011-04-05
|
Aankondiging van een opdracht
|
2011-04-21
|
Aanvullende inlichtingen
|
2012-05-31
|
Award Aankondiging
|