2020-12-21Mixing Reactor, Crystallising Equipment, Drying Equipment + Silo and 2 x Filterpress (Elemetal B.V.)
For completion of the demonstration plant Elemetal B.V., from now called ‘contracting entity’, request the build and delivery and commissioning of several parts of the demonstration plant. The contracting entity has chosen to divide this tender into the three following lots:
1) Mixing Reactor
2) Crystalliser Equipment
3) Drying Equipment
4) 2 x Filterpress
Bekijk de aanbesteding »
2020-10-30Mixing Reactor, Crystallizing Equipment, Drying Equipment + Silo and 2 x Filterpress (Elemetal B.V.)
For completion of the demonstration plant Elemetal B.V., from now called ‘contracting entity’, request the build and delivery and commissioning of several parts of the demonstration plant. The contracting entity has chosen to divide this tender into the three following lots:
1) mixing reactor,
2) crystallizer equipment,
3) drying equipment,
4) 2 x filterpress.
Bekijk de aanbesteding »
2012-06-29Biomass scale up buggenum (NUON Power Buggenum B.V.)
The Willem Alexander Centrale (WAC) is a coal gasification power plant, located in the southern part of the.
Netherlands. The power plant has a capacity of approximately 240MWe, is commissioned in 1993.
To reduce CO2 emissions, the possibility of co-gasification of biomass in the WAC is being studied. The strategy of Nuon aims to co-gasify 70 % (energy basis) biomass at the WAC. In order to reach this goal, Hardware.
Modifications (HMs) to the exisiting facility are required.
For more general information …
Bekijk de aanbesteding »
2012-06-29Biomass Scale Up Buggenum (NUON Power Buggenum)
The Willem Alexander Centrale (WAC) is a coal gasification power plant, located in the southern part of the Netherlands. The power plant has a capacity of approximately 240MWe, is commissioned in 1993.
To reduce CO2 emissions, the possibility of co-gasification of biomass in the WAC is being studied. The strategy of Nuon aims to co-gasify 70 % (energy basis) biomass at the WAC. In order to reach this goal, Hardware Modifications (HMs) to the exisiting facility are required. For more general information …
Bekijk de aanbesteding »