2015-07-03Lowering and Remedial Burial NorNed cable in Westereems area (TenneT TSO)
The NorNed HVDC cable, constructed in the period between 2006 and 2008 is a HVDC long distance 450 kV power exchange link between Feda in Norway and Eemshaven in The Netherlands and for the first 270 kilometres consist of two identical single core mass impregnated cables with one common double steel armoring.
Due to (1) deepening of the Westereems shipping channel and (2) unstable seabed in the Waddensea area, the Cable burial depths must at these locations be increased while the Cable remains in …
Bekijk de aanbesteding »
2015-04-22Bestek 4171 openbare verlichting Koningsplein (Gemeente Enschede)
— Het verwijderen, afkoppelen en afvoeren van ongeveer 70 stuks lichtmasten en armaturen.
— Het leveren en aanbrengen (bedrijfsklaar) van ongeveer 45 stuks lichtmasten, armaturen en verlichtingsobjecten.
— Het leveren en aanbrengen van ongeveer 115 stuks verlichtingsobjecten.
— Het verzorgen en coördineren van het af- en heraansluiten van de lichtmasten door de netbeheerder Enexis.
— Het nummeren van ongeveer 160 stuks lichtmasten en het aanleveren van beheergegevens.
— Het maken van een …
Bekijk de aanbesteding »
2014-11-132014-07-01426 — Aanleg Walstroom (Gemeente Arnhem)
Het project Walstroom Arnhem heeft betrekking op de Nieuwe Kade aan de Rijn. De gemeente is voornemens om 10 walsstroomaansluitingen aan te leggen voor passagiersvaartschepen. Bij deze kade die wordt opgedeeld in twee walsstroomlocaties gaat het in dit project om 10 ligplaatsen waar passagiersvaartschepen aanleggen. Dit project omvat het elektrotechnisch ontwerpen en installeren van 10 walsstroomaansluitingen voor passagiersvaartschepen (openbaar, inclusief geavanceerd betalingssysteem). Deze …
Bekijk de aanbesteding » Genoemde leveranciers:Van Gelder Kabel-, Leiding- en Montagewerken BV
2014-10-06HVDC Cable system COBRA Cable (TenneT TSO)
The Dutch and Danish Transmission System Operators (TSO's), TenneT and Energinet.dk, wish to realize a power link (interconnector) between Endrup in Denmark and Eemshaven in The Netherlands. The purpose of the power link (interconnector), titled COBRAcable, is to allow the integration of more renewable energy into the European power grid through the Dutch and Danish power systems and to increase security of power supply.
This contract notice is regarding the scope for a submarine and underground cable …
Bekijk de aanbesteding »
2014-02-07COBRAcable Licensing Dutch and German Inshore (TenneT TSO)
A subsea HVDC interconnector is to connect the Dutch grid at Eemshaven managed by TenneT TSO with the Danish grid at Endrup managed by Energinet.dk. The initiative called COBRAcable started in 2010 by introducing it to several competent authorities. After a break of 1.5 years the project planning has resumed in autumn 2013.The route of the interconnector can be divided into five sections: -Dutch land route-Southern inshore (Dutch/German landfall till 12-mileszone)-German EEZ-Northern inshore (Danish …
Bekijk de aanbesteding »
2012-08-02Distributed 380kV cable temperature monitoring and rating (TenneT TSO B.V.)
TenneT has installed the 380kV high voltage connection 'Randstad380', which is a 380 kV high voltage connection including cables. Although several 380 kV cable projects have been realized in Europe, the operation experiences of this kind of cable in meshed networks are very limited in general. Operation time is relatively short and behaviour of this kind of cables in 380 kV transmission systems is not clear. Therefore, TenneT has defined a research program in which the behaviour of long 380 kV cable …
Bekijk de aanbesteding »
2012-06-01Powercable connection monitoring system (TenneT TSO B.V.)
Powercable connection monitoring system for 380kV high voltage cable. Several 380 kV XLPE cable projects have been realized in Europe, the operation experiences of this kind of cable in meshed networks are however very limited in general. Operation time is relatively short and behaviour of this kind of cables in 380 kV transmission systems is not clear.
TenneT has asked to proof the theoretical models on system level using off-line or on-line measurements. To be able to measure a monitoring/measuring …
Bekijk de aanbesteding »
2012-04-05Remedial burial activities NorNed HVDC cable in Eems/Waddenzee area (TenneT TSO B.V.)
Remedial burial activities to increase the protection of the NorNed HVDC cable in the Eems and Waddenzee along the cable route from KP 0.0 to KP 40.0. Target burial depth is 2 meters and at certain areas 3 meters. Preference is that activities are executed while HVDC cable connection is in operation at + 450 kV DC and - 450 kV DC.
The NorNed HVDC cable, constructed in the period from 2006 to 2008, consists of a two core HVDC connection between the Netherlands and Norway. The area between KP 0.0 (the …
Bekijk de aanbesteding » Genoemde leveranciers:Van Oord Offshore B.V.
2011-10-17Levering, monteren en testen van 50kV Kabelsysteem (Enexis B.V.)
Voor een project in Tilburg is Enexis op zoek naar een leverancier die +/- 72 km YMeKrvasdlwd 36/50 kV 1 x800 ALrm as 50 (3 x 3 fasen 1 x 800) kabelsysteem kan leveren, monteren en testen. Dit inclusief moffen en eindsluitingen. Alsmede hiervoor het binnen de garantie termijn het storingsonderhoud kan verzorgen. Er bestaat een mogelijkheid dat er in er nog wordt besloten om voor een dezelfde kabel te kiezen alleen dan in een 630 mm2 uitvoering. Dit zal in de volgende fase van deze aanbesteding (RFP …
Bekijk de aanbesteding »
2011-07-14Deepening the NorNed cable in the Westereems Shipping Channel (TenneT TSO BV)
The Westereems (Waddenzee area, Netherlands) has to be deepened for vessel traffic reasons. The NorNed cable crosses the Westereems and the NorNed cable has to be deepened accordingly. Objective is to perform the deepening activities in 2011; preferences is execution in septerber/october 2011.