2020-07-10   Windfarm Zutphen and Duiven (Waterschap Rijn en IJssel)
Water board Rijn and IJssel 'With more than 375 employees, water board Rijn and IJssel take care of water management in a part of The Netherlands which can be defined as the East of Gelderland, the south of Overijssel and the south-east of the Veluwe. In this area, the water board ensures safety of the dikes and quays, the purification of waste water from residents and companies, sufficient and high-quality surface water and keeping the Oude Ijssel navigable for ships.' See also www.wrij.nl Purpose of … Bekijk de aanbesteding »
Genoemde leveranciers: Enercon GmbH - Dutch Branch
2017-10-25   Clipper: wind farms Wieringermeer 2.0, Haringvliet, Moerdijk and Nieuwe Hemweg (NV Nuon Energy)
Supply of 51 wind turbines, approximately 153MW — 204MW, at four onshore wind park sites in The Netherlands. This tender consists of 4 lots: Haringvliet, Moerdijk, Wieringmeer 2.0 and Nieuwe Hemweg. Bekijk de aanbesteding »
2017-10-06   Onshore Maintenance and Service Works for Prinses Alexia (N.V. Nuon Energy)
This Tender concerns the provision of support services for Onshore Maintenance and Service Works for Prinses Alexia Wind Farm including but not limited to scheduled maintenance and unscheduled maintenance, as well as additional services such as provision of additional personnel, main component exchange and major repairs, provision of Parts. The goal of this tender is to enter into a contract with 1 or 2 parties for the term of 2 years with option to prolong the agreement for a period of 1 more year. Bekijk de aanbesteding »
2017-07-17   EWTW-II — wind turbines #2 (ECN Wind Energy Facilities BV)
Het ontwerp, engineering, fabricage, transport, installatie, installatieapparatuur, inbedrijfstelling, bouw, exploitatie en onderhoud van de 8 windturbine generatoren in het EWTW II project, inclusief de fundamenten van de windturbine generatoren. Bekijk de aanbesteding »
Genoemde leveranciers: Vestas Benelux B.V.
2016-12-12   EWTW-II — Wind Turbines (ECN Wind Energy Facilities B.V.)
The design, engineering, manufacturing, transportation, installation, installation equipment, commissioning, construction, operation and maintenance of the 8 Wind Turbine Generators in the EWTW II project, including the foundations, the crane hardstands and the roads required for the installation and the maintenance of the Wind Turbine Generators. Bekijk de aanbesteding »
2016-02-01   Wind Turbines Supply and Service Nuon Windpark Wieringermeer (N.V. Nuon Energy)
The scope of work of this tender includes the design, engineering, manufacturing, fabrication, installation, installation equipment, transportation, commissioning and maintenance of the WTGs (excluding foundations). The tender process will result in 2 contracts: 1 turbine supply agreement and 1 service agreement. The 2 contracts will be entered into with the same supplier. Bekijk de aanbesteding »
Genoemde leveranciers: Nordex Energy GmbH
2015-10-15   Slufterdam Wind Farm (Nuon Wind Development BV en Windpark Eneco Slufterdam BV)
Restructuring and repowering existing windfarm with 14 wind turbines approx. 45 MW. Bekijk de aanbesteding »
2014-04-18   Windpark Barrepolder (Delta Energy BV)
Geplande realisatie Windpark Barrepolder in 2015. Levering en installatie van 4 windturbines met een een vermogen van 2 a 3MW per turbine. Bekijk de aanbesteding »
2014-01-17   Aanbesteding Concessie Windturbines Hazeldonk (Gemeente Breda)
De gemeente Breda heeft ambitieuze duurzaamheiddoelstellingen: in 2044 energieneutraal, in 2020 30 % CO2-reductie ten opzichte van 1990, in 2020 20 % duurzame energie in de energievoorziening en minimaal 2 % efficiencyverbetering per jaar. Om deze doelstellingen te halen is de realisatie van windenergieprojecten onontbeerlijk. Op het bedrijventerrein Hazeldonk (onderdeel van het grensoverschrijdende Logistics Center Hazeldonk-Meer) is een planologische procedure doorlopen om het bestemmingsplan zodanig … Bekijk de aanbesteding »
Genoemde leveranciers: Samenwerkingsverband DunoAir BV en...
2013-11-28   Wind Turbine Generator Package (Vattenfall Vindkraft A/S)
Vattenfall intents to participate in the call for bids for the concession of offshore wind farm Horns Rev 3 concession, led by the DEA [Danish Energy Agency]. This wind farm will have a capacity of maximum 400 MW and will consist of foundations, wind turbine generators and inter array cables. The total scope of works of this tender includes the design, engineering, manufacturing, fabrication, supply, installation, commissioning and operation and maintenance of the offshore wind turbine generators for the … Bekijk de aanbesteding »
2012-03-05   Provision of scheduled and unscheduled maintenance of wind turbine generator (WTG) (N.V. Nuon Duurzame Energie)
There are 7 windparks with different number of turbines of different types / manufacturers. All these windparks are out of warranty. We are looking for contractors who can provide us with maintenance work. The contractor shall provide to the contracting entity during the term all work, supplies and services that are required to keep the turbines required to keep the turbines operational and in good condition. The contract will include scheduled maintenance as described in the service and maintenance … Bekijk de aanbesteding »