2022-03-08Offshore pipeline installation (Porthos Offshore Transport and Storage C.V.)
The work consists of the offshore installation works, including:
• Dredging work in the nearshore zone and in the Maasgeul
• The execution of the shore crossing by pipe pull through a pre-installed HDPE carrier pipe.
• The installation of the offshore pipeline section. Approximately 20 km. The primary pipe configuration is a 16 inch nominal diameter, MLPP anti corrosion & thermal insulation coating with a concrete weight coating on top of the MLPP.
• Backfilling of the dredged sections of pipeline
• …
Bekijk de aanbesteding »