2012-06-29Biomass Scale Up Buggenum (NUON Power Buggenum)
The Willem Alexander Centrale (WAC) is a coal gasification power plant, located in the southern part of the Netherlands. The power plant has a capacity of approximately 240MWe, is commissioned in 1993.
To reduce CO2 emissions, the possibility of co-gasification of biomass in the WAC is being studied. The strategy of Nuon aims to co-gasify 70 % (energy basis) biomass at the WAC. In order to reach this goal, Hardware Modifications (HMs) to the exisiting facility are required. For more general information โฆ